ML17319A538

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 80-20, Failures of Westinghouse Type W-2 Spring Return to Neutral Control Switches. Action Required
ML17319A538
Person / Time
Site: Cook  
Issue date: 07/31/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
INDIANA MICHIGAN POWER CO.
References
NUDOCS 8008180086
Download: ML17319A538 (2)


Text

Docket No. 50-315 Docket No. 50-316 American Electric Power Service Corporation Indiana and Michigan Power Company ATTN:

Mr. John E. Dolan Vice Chairman Engineering and Construction 2 Broadway New York, NY 10004 Gentlemen:

Enclosed is IE Bulletin No. 80-20 which requires action by you with regard to your nuclear power facility.

In order to assist the NRC in evaluating the value/impact of each bulletin on licensees, it would be helpful if you would provide an estimate of the manpower expended in conduct of the review and preparation of the reports required by the bulletin.

Please estimate separately the manpower associated with corrective actions necessary following identification of problems through the bulletin.

Should you have any questions regarding this bulletin or the actions required by you, please contact this office.

Sincerely, James G. Keppler Director

Enclosure:

IE Bulletin No. 80-20 cc w/encl:

Mr. D. V. Shaller, Plant Manager Central Files

Director, NRR/DPM
Director, NRR/DOR PDR I,ocal PDR NSIC TIC Ronald Callen, Michigan Public Service Commission RIII RIII Hei an/np e p er 7/31/80 Sf 800818'00

~ ~

h C