ML17319A509
| ML17319A509 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 06/30/1980 |
| From: | Novak T Office of Nuclear Reactor Regulation |
| To: | Dolan J INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| References | |
| NUDOCS 8007210088 | |
| Download: ML17319A509 (5) | |
Text
SuNE Docket Nos.
5 an
~0-31 6 Distribution 50-315 316 l/1 NRC PDR Local PDR TERA
'SIC NRR Reading ORB1 Reading D. Eisenhut Intr. John Dolan, Vice President T. Novak Indiana and Michigan Electric Coo@any IjE (3)
( /1 1)
Post Office Box 18 Bowling Green Station S. Miner New York, New York 10004 G.
W. McCorkle (w/1 encl)
Dear Mr-Dolan:
ACRS (16)
(w/1 encl)
As a result of our review of your Safeguards Contingency Plan for the Donald C. Cook Nuclear Plant and the information provided in your April 21, 1980 letter to Harold R-Denton, we find that we require additional information.
The specific information required is listed in the enclosure.
Your response is requested within 30 days of receipt of this letter.
Our review of your plan has shown that the'plan requires, substantial revision for it to be acceptable.
Therefore, we recomvand that you take this opportunity to revise the Safeguards Contingency Plan's format so that it is more in line with the format of Regulatory Guide 5.50.
Sincerely,
Enclosure:
Request for Additional Information Mc.4Q Hg WO&5 + P0~9 Thomas H. Novak, Assistant Director for Operating Reactors Division of Licensing cc:
w/o enclosure See. next page 800VS j9OSS "SEE PREVIOUS YELLOlf FOR CONCURRENCE OFFICE $,.DL:ORB1+..
~ SMiner:.jb.
..0'.../80..
SURNAME QATEI NRC FORM 318 (9 76) NRCM 0240 DL:ORB1" "" DL'.ADER"'"
MVarga """TMNovek""".
06/.../80...... 06/../.80......
4U.S. GOVERNMENT PRINTING OFFICE: 1979 289 369
Wa
'1
.y 'hp
i~S RECII~
C
,r 0
(
0
+r~
~O
<<+*a>>
UNITEDSTATES NUCLEAR REGULATORY COMMlSSION WASHINGTON, D. C. 20555 June 30, 1980 Docket Nos.
50-315 and 50-316 Mr. John Dolan, Vice President Indiana and Michigan Electric Company Post Office Box 18 Bowling Green Station New York, New York 10004
Dear Mr. Dolan:
As a result of our review of your Safeguards Contingency Plan for the Donald C.
Cook Nuclear Plant and the information provided in your April 21, 1980 letter to Harold R. Denton, we find that we require additional information.
The specific information required is listed in the enclosure.
Your response is requested within 30 days of receipt of this letter.
Our review of your plan has shown that the plan requires substantial revision f'r it to be acceptable.
Therefore, we recomend that you take this opportunity to revise the Safeguards Contingency Plan's format so that it, is more in line with the format of Regulatory Guide 5.54.
Since> ely,
~
~
~rr7 omas M. Novak, Assistant Director for Operating Reactors Division of Licensing
Enclosure:
Request for Additional Information cc:
w/o enclosure See next page
c Mr. John Dolan Indiana and Michigan Electric Company June 30, 1980 cc:
Mr. Robert W. Jurgensen Chief NucIear Engineer American Electric Power Service Corporation 2 Broadway New York, New York 10004 Gerald Charnoff, Esquire
- Shaw, Pittman, Potts and Trowbridge 1800 M Street, N-W.
Washington, D. C.
20036 Citizens for a Better Environment 59 East Van Buren Street Chicago, Illinois 60605 Maude Preston Palenske Memorial Library 500 Market Street St. Joseph, Michigan 49085 Mr. D. Shaller, Plant Manager Donald C.
Cook Nuclear Plant P. 0.
Box 458
- Bridgman, Michigan 49106 Mr. Robert Masse Resident Inspector Donald C.
Cook Nuclear Plant U. S. Nuclear Regulatory Commission P. 0.
Box 458
- Bridgman, Michigan 49106 William J. Scanlon, Esquire 2034 Pauline Boulevard Ann Arbor, Michigan.48103
p' r