ML17318A735

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 80-09, Hydramotor Actuator Deficiencies. Written Response Required
ML17318A735
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 04/17/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER CO., INC., INDIANA MICHIGAN POWER CO.
References
NUDOCS 8005070109
Download: ML17318A735 (1)


Text

AL PILES A~sowo iNg Docket No. 50-315 Docket No. 50-316 APRIL Sgy American Electric Power Service Corporation Indiana and.Michigan Power Company ATTN:

Mr. John E. Dolan Vice Chairman Engineering and Construction 2 Broadway New York, NY 10004 Gentlmen:

The enclosed Bulletin 80-09 is forwarded to you for action.

A written response is required.

If you require additional information regarding this matter, please contact this office.

Sincerely, James G. Keppler Director

Enclosure:

IE Bulletin No. 80-09 cc w/encl:

Mr. D. V. Shaller, Plant Manager Central Files

Director, NRR/DPM
Director, NRR/DOR PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission RIII RIII Hei an/jp e

ler 4/17/80 (g