ML17318A720

From kanterella
Jump to navigation Jump to search
Forwards LER 80-007/03L-0
Date released: 05/31/2018 Download: ML17318A720


LER 80-007/03L-0:on 800326,while Revising Surveillance Test Procedure for Containment Spray Sys,Some Valves in Sys Flow Path Were Discovered Not Being Cycled at Required Intervals. Caused by Personnel Overlooking Test Frequency Differences
ML17326A682
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 04/25/1980
From: Chadwell H
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17326A682 (4)
Forwards LER 80-007/03L-0
ML17318A719
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 04/25/1980
From: Shaller D
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17318A719 (2)