ML17318A710

From kanterella
Jump to navigation Jump to search
Forwards IE Circular 80-07, Problems W/Hpci Turbine Oil Sys. No Written Response Required
ML17318A710
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 04/03/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER CO., INC.
References
NUDOCS 8004220339
Download: ML17318A710 (2)


Text

APA 3 pep Docket No. 50-315 Docket No. 50-316 American Electric Power Service Corporation Indiana and Michigan Power Company ATTN:

Mr. John E. Dolan Vice Chairman Engineering and Construction 2 Broadway New York, NY 10004 Gentlmen:

The enclosed Circular No. 80-07 is forwarded to you for information.

No written response is required.

Should you have any questions related to your understanding of the recommendations on this matter, please contact this office.

Sincerely, James G. Keppler Director

Enclosure:

IE Circular No. 80-07 cc w/encl:

Mr. D. V. Shaller, Plant Manager Central Files

Director, NRR/DPM
Director, NRR/DOR PDR I,ocal PDR NSIC TIC Ronald Callen, Michigan Public Service Commission RII RI Hei an/jp 4/2/80 ppler

0 y

d 5