ML17318A544
| ML17318A544 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 12/31/1979 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Dolan J INDIANA MICHIGAN POWER CO. |
| References | |
| NUDOCS 8001100216 | |
| Download: ML17318A544 (2) | |
Text
Docket No. 50-315 Docket,No.
50-316 American Electric Power Service Corporation Indiana and Michigan Power Company ATTN:
Mr. John E. Dolan Vice Chairman Engineering and Construction 2 Broadway New York, NY 10004 Gentlemen:
The enclosed IE Information Notice No..79-35 provides information on the control of maintenance and essential equipment.
Sincerely, James G. Keppler Director
Enclosure:
IE Information Notice No. 79-35 cc w/encl:
Mr. D. V. Shaller, Plant Manager Central Files
- Director, NRR/DPM
- Director, NRR/DOR
.PDR Iocal PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Citizens for a Better Environment RIII RI Heis an/jp K pier 12/28/79
UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 December 31, 1979 SSINS No.:
6870 Accessions No.:
7910250510 IE Information Notice No. 79-35 CONTROL OF MAINTENANCE AND ESSENTIAL EQUIPMENT Description of Circumstances:
Enclosed is a copy of a recent enforcement action against Duguesne Light Company.
A copy of this action is being forwarded to all utilities with a power reactor operating license or a construction permit.
This is being done to apprise you of a serious condition which revealed an apparent weakness in facility control of maintenance and essential equipment.
You should review your existing procedures and control for independent verification of operability of redundant counterpart equipment when an essential component, subsystem, or system is determined inoperable.
Operability is defined as follows:
A system, subsystem, train, component or device shall be OPERABLE or have OPERABILITY when it is capable of performing its specified function(s).
Implicit in this definition shall be the assumption that all necessary attendant instrumentation,
- controls, normal and emergency electrical power
- sources, cooling or seal water, lubrication or other auxiliary equipment that are required for the system, subsystem,
- train, component or device to perform its function(s) are also capable of performing their related support function(s).
If you have any questions regarding this matter, please contact the Director of the NRC Regional Office in which your facilities are located.
No written response to this IE Information Notice is required.
Enclosures:
1.
Letter to Duguesne Light Company from V. Stello, Jr., dtd. 12/5/79 2,
Recently Issued IE Information Notices