ML17318A530
| ML17318A530 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 12/28/1979 |
| From: | Shaller D INDIANA MICHIGAN POWER CO. |
| To: | |
| References | |
| NUDOCS 8001030621 | |
| Download: ML17318A530 (3) | |
Text
REGUlATORY 'RMATION DISTRIBUTION SYS I (RIDS)
ACCESSION NBR ~ 800 1 03062 1 DOC ~ DATE! 79/1 2/28 NOTARIZED ~
NO FACELl50 315 Donald'., Cook Nuclear Powei Planti Onit li Indiana L
AOYH g NAME
'UTHOR At'F1LYAl'ION SFIAt:CEKgt) ~ V.
Indiana 6 Itl'ichigan Power Co.
Rft'IF, NAME "RECIPIENT'F'FILIATLON'OCKET 05ootIps curl JKGT: ~791212 metero logical monitor 1ng lnet r umentat lan out of svc 'ue to insta) l at i on of new equipment g Ins tel I at i on delayed by adverse weather conditions',Instrumentation operable after installation Il calibr completed, DISTRIBUTION CODE!
A002S COPIES RECEIVED ~ O'TR
/
ENCL>> Q SIZE!~
'"""T':
nc ent" epor ts "'"'WWW MemwMeme~
r"=
ACTION:
INTERNAL:
EXTERNAL; RKC IP IKNT'D eIIOEiNAMK; 05 Be, ~gg ~
0 REG FILE; 0A YA/EDO i6 EFB, i8 PlANT SYS BR 20 AU"iPI AA'f SYS 28 EAGA BH 25 fItIR SYS BR 2'I OPERA LI6 BR 29 A'OR SY8"BR'ANAUKRaSg STS GRUUI LEADR 03 LPDR 29 ACR8 COPIES t:h'fH EN r ~
4 m
& ~
1 1
ii iii RECIPIENT L
ID COOL/NAMK'-'-
02 NRC PDR 11 HPA iS NOPAK/KNIEI i7
'A'D"FOR ENGH 19 LLC SYS BA 22 HEAC SAFt BR 24 RAECEA 26 AOi8TTE,-ANAL 28 ACDENT AAL78 E JORDAN/IF;""'
IHKl:AND" TM'I 8 "SYREKT 04 NSIC COPIES LTYA"EACL.
1 1
i 1ii 1
TOTAL NUMBER OF COPIES RKQUIREDe lTTR ~
ENCL rrT+r.5 Iil<<'t'lttr)t)Irrrt.r'Irr(rP )]'ru49rit>l' tr'I'" ~
,'<e'tlrr>rr'IHr"I
4 4
V 4
II Y
4 1
Op
/~leotvla INDIANA& MICHIGANPOWER COMPANY DONALDC. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 (616) 465-5901 December 28, 1979 Operating License DPR-58 Docket 8 50-315 Mr. J.
G. Keppler, Regional Director Office Of Inspection and Enforcement U. S.
Nucleat Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137
Dear Hr. Keppler:
This report is submitted as required by Technical Specification 3.3.3.4, as the required Meteorological Monitoring Instrumentation was inoperable from December 12, 1979 until December 24, 1979.
The Meteorological Monitoring Instrumentation was taken out-of-service on Decemb'er 12, for the installation of new meteorological equipment, of a modified design, to improve Meteorological System operability during the win-ter months.
The completion of the new equipment installation was delayed by several days of adverse weather conditions, preventing any work on the weather tower.
After completing the installation and calibration of the new equipment, the Meteorological Monitoring Instrumentation was determined to be operable on December 24, 1979.
No gaseous releases were made during this time period.
Very truly yours,
/ms cc: J.
E.
R.
S.
R.
H.
R.
F.
R.
R.
E.
R.
C.
C.
Dol an Hunter Jurgensen Kroeger Kilburn Masse RO:III Callen HPSC Charnoff',
Esq.
D. V. Shaller Plant Manager qDg 0
G. Olson J.
H. Hennigan PNSRC J.
F. Stietzel E. L. Townley Dir., IE (20 copies)
Dir., MIPC (2 copies) s'eo(aroint OEG ~ < ~~79
&0trrO'TQ+Rl!5