ML17318A458
| ML17318A458 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 11/15/1979 |
| From: | Shaller D INDIANA MICHIGAN POWER CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| NUDOCS 7911300542 | |
| Download: ML17318A458 (4) | |
Text
REGULATORY INFORMATION DISTRIBUTION S STEM (RODS)
ACCESSION NBR $ 79113005r12 DOC ~ DATE o 79/11/15 NOTARIZED e NO FACIC 50 316 Donald C., Cook 'Nuc 1 eei Powei 1 ent J On) t 2J Indi ana 8,
AUTH ~ NAME AUTHOR AFFILIATION SHALLER*JD,VS Indjane 8 Aichigan Power Co, REC'fP, NAME REC IP IKNT AFFILIATION DOCKET ¹ 05000316
SUBJECT:
RO:on 791115J in Mode 6 operetionrchar ging flow path found isolated'et boron injection tank et inlet-8 outlet valves, Valve lineup.returned to'vc L flow verified,Detailed rept will 'be issued 'by 791128.
DISTRIBUTION CODE ~
A002S COPIES RECEIVED:LTR J ENCL 0 SIZE:
T nc ent eports ES S~/r/b Z CuS OF ALE wren Vn X ~E
~ m~eaaoa mwww~~~tama~wwmw~wwoeaww~waiweeeeeeweeeeaenemeemmwweeeew~~~w w~eeeweeea~weereww RKCIP IKNT COPIES REC IP IKNT COPIES IO'CObE/NAME LTTR ENCL ID* CODE/NAME LTTA ENCL ACTION+
05 BC 4E
%1 INTERNA 1
RKG FILE l4 TA/EDO i6 EKB 18 PE,ANT SYS BR 20 At) PLAA'f SYS 23 KAGR 'BR 25 PHR SYS BR 27 OPERA LIC BR 29 AOX 8Y8 BR HANAOERJS ~
'MI H STREET EXTERNALS 03 LPDR 29 ACRS 1
16 1
02 NRC PDR 11 MPA i5 NOVAK/KNIKL 17 AD FOR ENGR 19 I8C SYS SA" 22 REAC SAFT BR 24 KRKGER 26 AO/SITE ANAL 28 ACDENT ANLYS E JORDAN/IE STS CROUP 4KADR 04 NSIC Ja JLC 9 'l9r9 o
TOTAL NUMBER OF COPIES REQUIRED:
LTTR ~
ENCL
~
h hh ilh
~memen ND ANA & MICHIGANPDNER COM DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 November 15,~ 1979 Mr. J.G. Keppler, Regional Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-74 Docket No. 50-316
Dear Mr. Keppler:
This is to confirm our verbal report to NRC Region III Inspector, Mr. R.E. Masse, at 1035 hours0.012 days <br />0.288 hours <br />0.00171 weeks <br />3.938175e-4 months <br /> on November 15, 1979.
At that time we reported that with the unit in Mode 6 the charging flow path was found isolated at the Boron Injection Tank at both inlet, and outlet valves.
Since the normal charging flow path was already isolated, this constituted an unavailable flow path.
Upon discovery of this situation, we immediately returned the valve lineup to service and verified flow.
A followup report will be submitted by November 28,
- 1979, as required by Technical Specification Section 6.9.1.8.
Sincerely, D.V. Shaller Plant Manager
/bab cc:
J.E.
Dolan R.W. Jgrgensen R.F. Kroegeri R.W. Kilburn R.J. Vollen BPI R.E.
Masse RO:III R.C. Callen MPSC P.W. Steketee, Esq.