Ro:On 791115,due to Removal of Breaker,Power Interrupted from FMO-242 & FMO-212 Valves & turbine-driven Auxiliary Feedwater Pump Inoperable for 12 Minutes.Followup Rept to Be Submitted by 791129
ML17318A457
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 11/15/1979
From: Shaller D
INDIANA MICHIGAN POWER CO.
To:
References
NUDOCS 7911300528
Download: ML17318A457 (4)


Text

ACCESSION NBR'7911300528 DOC ~ DATE ~ 79/11/15 NOTARIZED ~

NO FACIE:50 315 Donald C>

Cook Nuclear Power Plantr

"'Oni t li Indiana AOTH;NAME AUTHOR AFFILIATION

$ AACLERiD,V, Indiana 8 Aichigan Power Co.

"RECAP.NAME

'RECIPIFNT AFF'ILIATION DOCKET 05000318

SUBJECT:

RO 791115:on 791115~due to removal of breakeripower interiupted fiom'FMO 242 L

FHO 212 valves L turbine-driven auxiliary feedwater pump inoperable for 12 minutes,Fol'lowup rept to be submitted by 791129

'ISTRIBUTION CODE:

A002S COPIES RECEI VED: LTR TITLE: Incident Reports NOTES'~K' H ~D

/9M P7BTZ..

l EvcL g SIZE:

M'WWM~IO ACTIONS INTERNAL EXTERNAL:

RECIPIENT ID COOE/NAME 05 'BC dg8'

/

1 REG E

14 TA/EDO ie EEB 18 PLANT SYS BH 20 AD PLANT SYS 23 EAGR 'SR 25 PHR SYS BR 27 OPERACIC BR 29 AOX SYS 'BR HANAUER'g8" TMI H STAEET 03 LPDR 29 ACRS COPIES LTTR ENCL 1

16 1

RECIPIENT ID'CODE/NaMZ 02 NRC PDR 1i HI%

15 NOVAK/KNIEL 17 AD FOR ENGR i9 18,C SYS BA 22 RFAC SAFT BR 24 KAFGEH 26 4D/SITE ANAL 28 ACDENT AALYS E JORDAN/IE 8T8 GROUP LEADR 04 NSIC COPIES LTTH ENCI.

1 1

~

~

y'p ct 5'f 0

TOTAL NUMBER OF COPIES REQUIRED:

LTTR ~

ENCL

I I'

~

i" h

t1

\\

~

H r ht 1l l>>

r ll pi 1

)

I g

4 II II I

t I

a

~

l W

e pa'4.

6 ~go 9

~p,g

Qmarlcsn INDIANA& MICHIGANPOWER COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 November 15, 1979 Mr. J.G. Keppler, Regional Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-58 Docket No. 50-315

Dear Mr. Keppler:

This is to confirm our verbal report to NRC Region III Inspector, Mr. R.E. Masse, at 1025 hours0.0119 days <br />0.285 hours <br />0.00169 weeks <br />3.900125e-4 months <br /> on November 15, 1979.

At that time we reported that due to the removal of a breaker, power was interrupted from two.FMO valves (FMO-242 and 212) for a period of twelve (12) minutes.

During this period the Turbine Driven Auxiliary Feedwater Pump was also inoperable.

A followup report will be submitted by November 29,

1979, as require'd by Technical Specification Section 6.9. 1.8.

Sincerely, D.V. Shaller Plant Manager

/bab cc:,

J.E.

Dolan R.W. Jprgensen R.F. kroeger R.W. Kilburn R.J. Vollen BPI

.g+!

R.E.

Masse RO:III R.C.- Callen MPSC P.W. Steketee, Esq.

R. Walsh, Esq.

G. Charnoff, Esq.

J.M. Hennigan G. Olson PNSRC J.F. Stietzel E.L. Townley Dir., IE (40 copies)

Dir., MIPC (4 copies)

S J'1 lit