ML17318A445

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-02,Revision 2, Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts. Action Required
ML17318A445
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 11/08/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
INDIANA MICHIGAN POWER CO.
References
NUDOCS 7911260229
Download: ML17318A445 (1)


Text

Docket No. 50-315 Docket No. 50-316 American Electric Power Service Corporation Indiana and Michigan Power Company ATTN:

Mr. John E. Dolan Vice Chairman Engineering and Construction 2 Broadway New York, NY 10004 Gentlemen:

Enclosed is IE Bulletin No. 79-02, Revision No.

2 which requires action by you with regard to your power reactor facilities with an operating license or a construction permit.

Should you have any questions regarding this Bulletin Revision or the actions required by you, please contact this office.

Sincerely, James G. Keppler Director

Enclosure:

IE Bulletin No. 79-02, Revision No.

2 cc w/encl:

Mr. D. V. Shaller, Plant Manager Central Files

Director, NRR/DPM
Director, NRR/DOR PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Citizens for a Better Environment RIII RIII Heis an/gc Keppler 11/8/79 V9zls8o 8~:7