ML17318A440
| ML17318A440 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 11/15/1979 |
| From: | Shaller D INDIANA MICHIGAN POWER CO. |
| To: | |
| References | |
| NUDOCS 7911210446 | |
| Download: ML17318A440 (3) | |
Text
SUBJECT; RO:on 791115idiscovered isolated charging flow path of boron injection tank of both inlet L outlet valves'alve lineup returned to SVS 8 Flow verified, Next rept will be submitted.
DISTR ISUTI ON CODE:
AOOES COPIES RECEIVED:LTR g ENCL Q.
SIZE: l TITLE: Incident Reports Wa>ES: gal%~
Q g~~! md<
3.~~ C RECIPIENT COPIES RECIPIENT IO CODE/NAME LTTR ENCL IO CODE/NAME COPIES LTTA ENCL I
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
I ACCESSEgN NSR:7911810446
%0C,DATE: 79/11/15 NOTAf<I4: NO DOCKET 4
FARE.I'C:50-316 Dona l d C.
Cook Nuclear Power P
1 ant i Oni t 2i Indi ana 8
05000316 AOTH.NAME AUTHOR AFFILIATION SHAI CERjD.V,,
Indiana 8 Hichigan Power Co, "REt'IP ~ NAME RECIPIENT AFFILIA'lION KEf'PLERiJ,be Region 3E chicagai office of the Director ACTIONS 05 BC ~48 ~ '/
INTERNAL'9 I8E'4 TA/EDO 16 EEB'8 PLANT SYS BR 20 AD PLANT SY$
23 ENGR BR 25 PlNR SY$
BR 27 OPERA 'LIC'R 29 AOX 'SYS '8R HAhlAOERi S ~
TMI H STREET EXTERNAL: 03 LPDR 29 ACRS 1
1 16 6
02 NRC PDR 11 HPA 15 NOVAK/KNIEL 17 AD FOR ENGR 19 I8C SYS BR 22 REAC SAFT BR 24 KREGER 26 AD/SITF ANAL 28 ACDENT AALYS E JORDAN/IE STS GROUP f.EAOR 04 NSIC 1
3 1i 1
1 1
1 1
40yg 9 64 "]gg~1 TOTAL NUMBER OF COPIES REQUIRED:
LTTR ~
ENCL
ll I
llh, '
(,;"~iri ra I leuc eeewsaeo em DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49108 November 15, 1979 Mr. J.G. Keppler, Regional Director Office of Inspection and Enforcement, United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-74 Docket No. 50-316
Dear Mr. Keppler:
This is to confirm our verbal report to NRC Region III Inspector, Mr. R.E. Masse, at 1035 hours0.012 days <br />0.288 hours <br />0.00171 weeks <br />3.938175e-4 months <br /> on November 15, 1979.
At that time we reported that with the unit in Mode 6 the charging flow path was found isolated at the Boron Injection Tank at both inlet and outlet valves.
Since the normal charging flow path was already isolated, this constituted an unavailable flow path.
Upon discovery of this situation, we immediately returned the valve lineup to service and verified flow.
A followup report will be submitted by November 28,
- 1979, as required by Technical Specification Section 6.9.1.8.
Sincerely, D.V. Shaller Plant ifanager
/bab cc:
J.E.
Dolan R.W. Jurgensen R.F. Kroeger R.W. Kilburn R.J. Vollen BPI R.E.
Masse RO:III R.C. Callen MPSC P.W. Steketee, Esq.
R. Walsh, Esq.
G. Charnoff, Esq.
G. Olson J.M. Hennigan PNSRC J.F. Stietzel E.L. Townley Dir., IE (40 copies)
Dir., liIPC (4 copies)
'r 91121O VPP