ML17318A374

From kanterella
Jump to navigation Jump to search
Forwards Revision 2 to IE Bulletin 79-13, Cracking in Feedwater Sys Piping. Action Required
ML17318A374
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/19/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
INDIANA MICHIGAN POWER CO.
References
NUDOCS 7910310259
Download: ML17318A374 (1)


Text

OCT 19 1979 Docket No. 50-315 Docket No. 50-316 American Electric Power Service Corporation indiana and Michigan Power Company ATTN:

Mr. John E. Dolan Vice Chairman Engineering and Construction 2 Broadway New York, NY 10004 Gentlemen:

Enclosed is IE Bulletin No. 79-13, Revision 2 which requires action by you with regard to your pressurized water power reactor facility.

Should you have any questions regarding this Bulletin or the actions required by you, please contact this office.

Sincerely, James G. Keppler Director

Enclosures:

1.

IE Bulletin No. 79-13, Revision 2 2.

List of IE Bulletins Issued in the Last Six Months cc w/encl:

Mr. D. V. Shaller, Plant Manager Central Piles

Director, NRR/DPM
Director, NRR/DOR PDR I,ocal PDR NSIC TIC Ronald Callen, Michigan Public

" Service Commission Citizens for a Better Environment RII)

Heis an/gc 10/17/79 RIII Keppler Io/fg

>9103I0 2 ~~

V ~

~

ew

~