ML17318A338

From kanterella
Jump to navigation Jump to search
Forwards LER 79-048/03L-0
Date released: 05/31/2018 Download: ML17318A338


LER 79-048/03L-0:on 790917,sample Pump for Radiation Monitor Was Inoperable Due to Failed motor-to-pump Coupling Insert. Caused by Failure of Rubber Spider in Coupling.Coupling Was Replaced & Air Sampler Tested
ML17326A289
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 10/17/1979
From: Wizner D
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17326A289 (2)
Forwards LER 79-048/03L-0
ML17318A337
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 10/17/1979
From: Shaller D
INDIANA MICHIGAN POWER CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17318A337 (2)