ML17318A309
Jump to navigation
Jump to search
| ML17318A309 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 08/13/1979 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Dolan J AMERICAN ELECTRIC POWER CO., INC. |
| References | |
| NUDOCS 7910090148 | |
| Download: ML17318A309 (1) | |
Text
AUG1 3 19/9 Docket No. 50-315 Docket No. 50-316 American Electric Power Service Corporation Indiana and Michigan Power Company ATTN:
Mr. John E. Dolan Vice Chairman Engineering and Construction 2 Broadway New York, NY 10004 Gentlemen:
-Enclosed is IE Bulletin No. 79-21 which requires action by you with regard to your PWR power reactor facilities with an operating license.
Should you have any questions regarding this Bulletin or the actions required by you, please contact this office.
Sincerely, James G. Keppler Director
Enclosures:
1.
List of IE Bulletins Issued in the Last 6 Months cc w/encls:
Mr. D. V. Shaller, Plant Manager Central Files
- Director, NRR/DPM