ML17318A307

From kanterella
Jump to navigation Jump to search
Forwards IE Circular 79-17, Contact Problem in SB-12 Switches on GE Metalclad Circuit Breakers. No Action Required
ML17318A307
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/14/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER CO., INC.
References
NUDOCS 7910050448
Download: ML17318A307 (1)


Text

Docket No. 50-315 Docket No. 50-316 gQ 4 $1~

American Electric Power Service Corporation Indiana and Michigan Power Company ATTN:

Mr. John E. Dolan Vice Chairman Engineering and Construction 2 Broadway New York, NY 10004 Gentlemen:

This Circular No. 79-17 is provided as an early notification of a possible significant matter. It is expected that recipients will review the information for possible applicability to their facilities.

No specific action pr response is requested at this time. If further NRC evaluations so indicate, an IE Bulletin will be issued to recommend or request specific licensee actions.

If you have questions regarding this 'matter, please contact the Director of the appropriate NRC Regional Office.

Sincerely, James G. Keppler Director

Enclosures:

l.

IE Circular No. 79"17 2.

List of IE Circulars Issued in the Last 6 Months cc w/encl:

Mr. D. V. Shaller, Plant Manager Central Piles

Director, NRR/DPM
Director, NRR/DOR PDR Iocal PDR

, NSIC TIC Ronald Callen, Michigan Public Service Commission Citizens for a Better Environment RIII RIII Heis n/gc Kep ler 8/13/79 P f3 V9XOOSO