ML17318A275

From kanterella
Jump to navigation Jump to search
LER 79-044/03L-0:on 790825,cable Penetration in Floor of Hot Shutdown Panel Found to Have Fire Barrier Seal Removed. Removed by Contractor for Design Change.Continuous Fire Watch Stationed
ML17318A275
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 09/18/1979
From: Wizner D
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML17318A274 List:
References
LER-79-044-03L, LER-79-44-3L, NUDOCS 7909250365
Download: ML17318A275 (2)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (BIDS)

ACCESSION NBRe7909250365 DOC,DATE: 79/09/18 NOTARIZED: NO DOCKET FAC IL:50 "31$ eco Nuclear Generating Station~ Sacr amento Mu 05000312 AUTH, NAME ~o~ AUTHOR AFFILIATION NIZNERqD.G. Indiana 8. Michigan Powet Co.

RECIP ~ NAME RECIPIENT AFFILIATION Region 3i Chicagoc Office of the Director SUBJECT; LER 79-040/03L,.-O:on 790825~cable penetration in floor of hot shutdown panel was found to have fire barrier seal removed, Caused by contractor removing it for design changers Continuous fire watch stationed, DISTRIBUTION CODE: A002S TITLE: Incident Reports COPIES RECEIVED!LTR I ENCL J SIZE:

NOTES: e~atelil~~+~~~+e~l+~a~++~w~~~&Wetaaaa+fHaw++aaw+0

~

I MRa+1~t++f~POW+ttPWwt+W~%~

RECIPIENT COPIES REC IP IENT COPIES ID CODE/NAME CTTR ENCL ID CODE/NAME LTTR ENCL ACTION: 05 BC OR 6 If'G INTERNAL: FILE 1 1 02 NRC PDR 1 0 2 2 11 MPA 3 14 TA/EDO 1 1 15 NOVAK/KNIEL i 16 EEB 1 17 At) FOR i i i ENGR'9 18 PLANT SYS BR 1 I8C SYS BR 1 20 AD PLANT SY8 1 1 22 REAC SAFT UR i 23 ENGR 'BR 1 2P KREGER 1 1 25 PHR SYS BR 1 1 26 AD/SITE ANAL 1 1 27 OPERA LIC BR'9 1 1 28 ACDENT ANLYS 1 i AUX SYS BR E JORDAN/IE 1 HANAUERgSi STS GROUP LEADR TMI H STREET 1 ~ 1 EXTERNAL! 03 LPDR 1 1 00 NSIC 29 ACRS 16 16 SPP g g 578

~ All TOTAL NUMBER OF COPIES REQUIRED: LTTR 08 ENCL 08

e.

sI r