ML17318A270

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-14,Suppl 2, Seismic Analysis for As-Built Safety-Related Piping Sys
ML17318A270
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 09/07/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER CO., INC.
References
NUDOCS 7909240091
Download: ML17318A270 (1)


Text

Docket No. 50-315 Docket No. 50-316 American Electric Power Service

. Corporation I%diana and Michigan Power Company ATTN:

Mr. John E. Dolan Vice Chairman Engineering and Construction 2 Broadway New York, NY 10004 Gentlemen:

The enclosed supplement to IE Bulletin No. 79-14 is forwarded to you to provide added guidance on the intent of the Bulletin. If you desire adds.tional information regarding this matter, please contact this office.

Sincerely, James G. Keppler Director

Enclosure:

Supplement 2 to IE Bulletin No. 79-14 cc w/encl:

Mr. D. V. Shaller, Plant Manager Central Files

Director, NRR/DPM
Director, NRR/DOR PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Citizens for a Better Environment RIII Hei an/bk 9/7/79 RIII e pier

/lo/3 I+

'F09sc g ~(