ML17317B378
Jump to navigation
Jump to search
| ML17317B378 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 07/11/1979 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Dolan J AMERICAN ELECTRIC POWER CO., INC., INDIANA MICHIGAN POWER CO. |
| References | |
| NUDOCS 7907310305 | |
| Download: ML17317B378 (1) | |
Text
JUL 11 t979 FLLOW Fll.E gape CENTRAL FlLFS Docket No. 50-315 Docket No. 50-316 American Electric Power Service Corporation Indiana and Michigan Power Company ATTN:
Mr. John E. Dolan Vice Chairman Engineering and Construction 2 Broadway New York, NY 10004 Gentlemen:
The enclosed IE Bulletin No. 79-15 is forwarded to you for action.
A written response is required.
If you desire additional information regarding this matter, please contact this office.
Sincerely, James G. Keppler Director
Enclosures:
1.
Listing of IE Bulletins Issued in Last 12 Months cc w/encl:
Mr, D. U. Shaller, Plant Manager Central Piles
- Director, NRR/DPM
Tlc Ronald Callen, Michigan Public Service Commission Citizens for a Better Environment yh90~959etDH Heishman/sr KepplerP 7/10/79 790 73I 03 05