ML17317B378

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-15, Deep Draft Pump Deficiencies. Action Required
ML17317B378
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 07/11/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER CO., INC., INDIANA MICHIGAN POWER CO.
References
NUDOCS 7907310305
Download: ML17317B378 (1)


Text

JUL 11 t979 FLLOW Fll.E gape CENTRAL FlLFS Docket No. 50-315 Docket No. 50-316 American Electric Power Service Corporation Indiana and Michigan Power Company ATTN:

Mr. John E. Dolan Vice Chairman Engineering and Construction 2 Broadway New York, NY 10004 Gentlemen:

The enclosed IE Bulletin No. 79-15 is forwarded to you for action.

A written response is required.

If you desire additional information regarding this matter, please contact this office.

Sincerely, James G. Keppler Director

Enclosures:

1.

IE Bulletin No. 79-15 2.

Listing of IE Bulletins Issued in Last 12 Months cc w/encl:

Mr, D. U. Shaller, Plant Manager Central Piles

Director, NRR/DPM
Director, NRR/DOR PDR Local PDR NSIC.

Tlc Ronald Callen, Michigan Public Service Commission Citizens for a Better Environment yh90~959etDH Heishman/sr KepplerP 7/10/79 790 73I 03 05