ML17317B358

From kanterella
Jump to navigation Jump to search
Forwards IE Info Notice 79-19, Pipe Cracks in Stagnant Borated Water Sys at PWR Plants. No Action Required
ML17317B358
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 07/18/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
INDIANA MICHIGAN POWER CO.
References
NUDOCS 7907260398
Download: ML17317B358 (2)


Text

CE'NTRAL RESS JUL 18 1979 Docket No. 50-315 Docket No. 50"316 American Electric Power Service Corporation Indiana and Michigan Power Company ATTN:

Mr. John E. Dolan Vice Chairman Engineering and Construction 2 Broadway New York, NY 10004 Gentlemen:

This Information Notice is provided as an early notification of a possibly significant matter. It is expected that recipients will review the infor-mation for possible applicability to their facilities.

No response is requested at this time, however, licensees should be aware that the NRC is evaluating the issuance of a Bulletin to operating PWR's requesting infor-mation on previous inservice inspections of stagnant borated water systems and requesting inspection of systems which have not been inspected recently.

If you have questions or comments regarding this matter, please contact the Director of the appropriate NRC Regional Office.

Sincerely, James G. Keppler Director

Enclosure:

IE Information Notice No. 79-19 cc w/encl:

Mr. D. V. Shaller, Plant Manager Central Files

Director, NRR/DPM
Director, NRR/DOR PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Citizens for a Better Environment RIII RIII He an/bk p ler 7/18/79 tao>>soggy 7

>l"'

ll a

~ P'w~

'I E