ML17317B308
| ML17317B308 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 05/18/1979 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Dolan J AMERICAN ELECTRIC POWER CO., INC. |
| Shared Package | |
| ML17317B309 | List: |
| References | |
| NUDOCS 7907130351 | |
| Download: ML17317B308 (3) | |
See also: IR 05000315/1979008
Text
~I.I II~CIA
%*~*4
UNITED STATES
'CENTRAL ALES
NUCLEAR
R E G ULATORY COMMISSION
R EG ION I I I
799 ROOSEVELT ROAD
GLEN ELLYN, ILLINOIS 60137
tIlAY 1 8 i979
Docket No. 50-315
American Electric Power Service
Corporation
and Michigan Power
Company
ATTN:
Mr. John E. Dolan, Vice Chairman,
Engineering
and Construction
2 Broadway
NY
10004
Gentlemen:
This refers to the inspection
conducted
by Mr.'. T. Yin of this
office on May 1-2,
1979, of activities at Donald
C.
Cook Nuclear
Plant, Unit 1, authorized
by NRC Operating License
No.
DPR-58 and to
the discussion of our findings with Mr. D. V. Shaller
and others of
your staff at the conclusion of the inspection.
The enclosed
copy of our inspection report identifies areas
examined
during the inspection.
Within these
areas,
the inspection consisted
of a selective
examination of procedures
and representative
records,
observations,
and interviews with personnel.
No items of noncompliance with NRC requirements
were identified
during the course of this inspection.
In accordance
with Section 2.790 of the NRC's "Rules of Practice,"
Part 2, Title.10,
Code of Federal Regulations,
a copy of this letter
and the enclosed
inspection report will be placed in the NRC's
Public Document
Room, except
as follows. If this report containes
information that you or your contractors
believe to be proprietary,
you must apply in writing to this office, within twenty days of your
receipt of this letter, to withhold information from public disclosure.
The application must include a full statement
of the reasons for
which the information is considered proprietary information identified
in the application is contained in an enclosure
to the application.
v907x30 35/
American Electric Power
Service Corporation
Power
Company
SLY 18 1979
We will gladly discuss
any questions
you have concerning this
inspection.
Sincerely,
Gaston Fiorelli, Chief
Reactor Construction
and
Engineering Support Branch
Enclosure:
IE Inspection
Report No. 50-315/79-08
cc w/encl:
Mr. D. V. Shaller, Plant
Manager
Central Files
Reproduction Unit NRC 20b
Local PDR
HSIC
Ronald Callen, Michigan Public
Service Commission
Citiaens for a Better Environment
OFFICE~
SURNAM~
OAT~
RIII
Yin/bk
5/15/7
NRC Form 3188 (RXE) t1.78) NRCM 0240
RIII
Danielso
RIII
FiorelTi
RI
Masse
6u at
/+ 7
~U.S,OOVERNMCNTPRINTINO OSPICE(
5555
255415