ML17317B307

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-14, Seismic Analysis for As-Built Safety-Related Piping Sys. Action Required
ML17317B307
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 07/02/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
INDIANA MICHIGAN POWER CO.
References
NUDOCS 7907130271
Download: ML17317B307 (1)


Text

Docket No. 50-315 Docket No. 50-316 American Electric Power Service Corporation Indiana and Michigan Power Company ATTN:

Mr. John E. Dolan Vice Chairman Engineering and Construction 2 Broadway New York, NY 10004 Gentlemen:

The enclosed IE Bulletin No. 79-14 is forwarded to you for action.

Written responses are required.

If you desire additional information regarding this matter, please contact this office.

Sincerely, James G. Keppler Director

Enclosure:

IE Bulletin No. 79-14 cc w/encl:

Mr. D. V. Shaller, Plant Manager Central Files

Director, NRR/DPM
Director, NRR/DOR PDR I,ocal PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Citizens for a Better Environment RIII RIII Heis an/sr p ler 6/29/79