ML17317B301

From kanterella
Jump to navigation Jump to search
Forwards IE Circular 79-10, Pipefittings Mfg from Unacceptable Matl. No Action Required
ML17317B301
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 06/26/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
INDIANA MICHIGAN POWER CO.
References
NUDOCS 7907060302
Download: ML17317B301 (2)


Text

Docket No. 50-315 Docket'o.

50-316 American Electric Power Service Corporation Indiana and Michigan Power Company ATTN:

Mr. John E. Dolan Vice Chairman Engineering and Construction 2 Broadway New York, NY 10004 Gentlemen:

This Circular is provided as an early notification of a possibly signif-icant matter.

It is expected that recipients will review the information for possible applicability to their facilities.

No specific action or response is requested at this time. If further NRC evaluations so indi-

cate, an IE Bulletin will be issued to recommend or request specific licensee actions.

If you have questions regarding this matter, please contact the Director of the appropriate NRC Regional Office.

Sincerely, James G. Keppler Director

Enclosure:

IE Circular No. 79-10 cc w/encl:

Mr. D. U. Shaller, Plant Manager Central Files

Director, NRR/DPM
Director, NRR/DOR PDR Iocal PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Citizens for a Better Environment RIII.

Heis an/bk 6/25/79

>~V0608Pg

t~

lf4