05000315/LER-1979-033-03, /03L-0 on 790308:monthly Functional Tests for Containment Area Monitor,Containment atmosphere-particulate & Containment atmosphere-gaseous Monitors Were Not Performed.Caused by Daily Assignment Error

From kanterella
(Redirected from ML17317B254)
Jump to navigation Jump to search
/03L-0 on 790308:monthly Functional Tests for Containment Area Monitor,Containment atmosphere-particulate & Containment atmosphere-gaseous Monitors Were Not Performed.Caused by Daily Assignment Error
ML17317B254
Person / Time
Site: Cook 
Issue date: 06/04/1979
From: Beilman T
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML17317B253 List:
References
LER-79-033-03L, LER-79-33-3L, NUDOCS 7906110239
Download: ML17317B254 (3)


LER-1979-033, /03L-0 on 790308:monthly Functional Tests for Containment Area Monitor,Containment atmosphere-particulate & Containment atmosphere-gaseous Monitors Were Not Performed.Caused by Daily Assignment Error
Event date:
Report date:
3151979033R03 - NRC Website

text

NRC FORM 366

'(7-77)

~o 7

8 CON'T

~o 7

8 U. S. NUCLEAR REGUI.ATORY COMMISSION LICENSEE EVENT REPORT (PLEASE PRINT OR TYPE ALLREQUIRED INFORMATION)

,Q COEITROL BLOCK:

I M

I D

C C

0 0 Qg4 1

1 I

1 Q4~Qg 25 26 LICENSE TYPE 30 57 CAT 58 1Q2 0

0 0

0 0

0 0

0 0

14,1 5 LICENSE NUMBER 9

LICENSEE CODE REPDRT ~L~B 0

5 0

0 0

3 1

5 Q7 0

3 0

8 7

9 Q Q

SOURCE 60 61 DOCKET NUMBER 68 69 EVENT DATE 74 75 REPORT DATE 80

'VENT DESCRIPTION AND PROBABLE CONSEQUENCES &10 ON 5-4-79 IT tJAS DISCOVERED THAT TH~ONTHLY FUNCTIONAL TESTS FOR THE CONTAINMENT AREA MONITOR (R-2),

CONTAINMENT ATMOSPHERE-PARTICULATE (R-ll) AND THE CONTAINMENT ATMOSPHERE-GASEOUS (R-12)

MONITORS HERE NOT PERFORMED ON 3-B-79 AS REOUIRED BY T.S. 'TABLE 4.3-2 ITEM 3c2, TABLE 4.3-3 ITEMS lb,2a AND 2b AND PARAGRAPH 4.4.6.l.a.

~og

~O7

~OB 7

8 9

80

~OB 7

8 SYSTEM

CAUSE

CAUSE COMP.

VALVE CODE CODE SUBCODE COMPONENT CODE SUBCODE SUBCODE

~IB Qqq

~A

~B Qn Z

Z Z

Z Z

Z Q>4

~Qig ~ Qtg 9

10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION 21 22 23 24 26 27 28 29 30 31 32 ACTION FUTURE EFFECT SHUTDOWN ATTACHMENT NPRD4 PRIME COMP.

COMPONENT L'ISLES L~J

&$ Q ')')+

U)I Q MRQ L~JS t CZ t l 8 33 34 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS &27 UPON INYESTIGATION IT HAS FOUND T)TAT THE TESTS HAD BEEN PRESCHEDULED FOR PERFORMANCE ON THE CORRECT DATE BUT,

HOWEVER, WERE NOT COMPLETED DUE TO A DAILY ASSIGNMENT ERROR ON THE PART OF THE-RESPONSIBLE SUPERVISOR, A REVIEW OF THE AFFECTED SECTIONS ADEQUATE AND NOT THE CAUSE OF THI'S OCCURRENCE.

(SEE SUPPLEMENT) 8 9

FACILITY

~3P METHOD OF Vl C

NON ROUTINE HEI KPSF LIQ" ST TUS 4 POWER g

(

Qgg ~lo 0

Qgg 7

8 9

10 12 13 44 ACTIVITY CONTENT RELEgASED OF RELEASE AMOUNTQF ACTIVITYQ EKI L'J Q33 L'JQ34 wA 7

8 9

10 11 44 PERSONNEL EXPOSURES 7

8 9

11 12 13 PERSONNEL INJURIES NUIYLBER DESCRIPTIONQ 0

0~

NA 45 46 LOCATIONOF RELEASE Q NA 45 9

11 12 LOSS OF OR DAMAGETO FACILITYQ43 TYPE

DESCRIPTION

Z Q42 9

10 PUBLICITY ISSUED DESCRIPTION~

~~Q44 9

10 3

SURVE ILLANCE SCHEDULING MECHANISM WAS PERFORMED WHICH IJAS DETERt1INED TO BE 80 80 80 80 7

8 o

7 8

NAME OF PREPARFR NA T.

P.

Beilman PHONE 80 31j3-465-5901 80 NRC USE ONLY o

80 o

0

0 r

h

ATTACIIMENT TC I E~

SUPPLEMENT TO CAUSE DESCRIPTION TO PREVENT RECURRENCE, SUPERVISORY RESPONSI'BILI'TIES CONCERNING SURVEILLANCE TEST SCHEDULING, PERFORMANCE AND COMPLETION llERE DISCUSSED L(ITH ALL APPLICABLE DEPARTMENTAL PERSONNEL.