Forwards IE Insp Repts 50-315/79-03 & 50-316/79-03 on 790313-16 & Notice of Violation
ML17317B192
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 03/28/1979
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER CO., INC.
Shared Package
ML17317B193 List:
References
NUDOCS 7905150817
Download: ML17317B192 (3)


See also: IR 05000315/1979003

Text

~P,q RE0I

Wp0

n

~ (

)

()

q,

)fp*y4

Docket No. 50-315

Docket No.

50-316

UNITED STATES

NUCLEAR

R EGULATORY COMMISSION

REGION III

799 ROOSEVELT ROAD

GLEN ELLYN, ILLINOIS 60137

MAR.

28. 879

N>R4g @ILES

American Electric Power Service

Coroporation

Indiana

and Michigan Power Company

ATTN:

Mr. John E. Dolan, Vice

Chairman,

Engineering

and Construction

2 Broadway

New York, NY

10004

Gentlemen:

This refers to the inspection conducted

by Miss R. J.

Greer of

this office on March 13-16,

1979, of activities at Donald

C.

Cook

Nuclear Plant, Units

1 and

2, authorized

by NRC Operating Licenses

No. DPR-58 and No. DPR-74 and to the discussion

of our findings

with Mr. Shaller

and others of your staff at the conclusion of the

inspection.

The enclosed

copy of our inspection report identifies areas

examined during the inspection.

Within these

areas,

the

inspection consisted of a selective

examination of procedures

and representative

records,

observations,

and interviews'ith

personnel.

During this inspection,

certain of your activities appeared

to be in noncompliance with NRC requirements,

as described

in the enclosed

Appendix A.

This notice is sent to you pursuant

to the provisions of

Section

2.201 of the NRC's "Rules of Practice," Part

2, Title

10,

Code of Federal Regulations.

Section

2. 201 requires

you

to submit to this office within twenty days of your receipt

of this notice

a written statement

or explanation in reply,

including for each item of noncompliance:

(1) corrective

action taken

and the results

achieved;

(2) corrective action

to be taken to avoid further noncompliance;

and (3) the date

when full compliance will be achieved.

g9II51.50II'I7 I

haerican Electric Power

- 2-

Service Corporation

Indiana and Michigan

Power Coepany

Wk 28.879

In accordance with Section 2.790 of the NRC's "Rules of Practice,"

Part 2, Title 109 Code of Federal Regulations,

a copy of this

letter, the enclosures,

and ycnxr response

to this letter vill be

placed in the HRC's Public Doeaaent

Rooa9

except as follows. If

the enclosures

contain inforaation that you or your contractors

believe to be proprietary,

you aeat apply tn writing to this office,

<<ithin teelaty hay)s et yeer receipt ef this letter, to withhold such

iafaxaaHea

facy ~lie dtsclosare

The apyltcatien aust include a

fell stateaent

of the reasons for which the inforaation is considered

proprietary,

and should be prepared

so that proprietary infor)aation

identified in the application is contained in an enclosure

to the

application.

We ~l gladly discuss

any questions

you have concerning this

inspection.

Sincerely,

A. B. Davis, Chief

Fuel Facility and

Materials Safety Branch

Enclosures:

l.

Appendix k., Notice

of Violation

2.

IE Inspection Reports

No. 50-315/79-03

and

No. 50-316/79W3

cc w/encls:

D. V. Sheller, Plant Manager

Central Files

Reproduction Unit HRC 20b

PDR

Local PDR

BASIC

TIC

Ronald Callen, Michigan Public

Service Co)eaission

Citixens for a Better.

OFFICEW -axxx. -

- mx--

Greer/blk

Essig

Davis

SURNA)4M

) ~7

DA~