ML17317B158

From kanterella
Jump to navigation Jump to search
Forwards Operating History Info Re Pressurizer Power Operated Relief Valves in Response to 790427 Request
ML17317B158
Person / Time
Site: Cook  
Issue date: 04/27/1979
From: Shaller D
INDIANA MICHIGAN POWER CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
References
NUDOCS 7905040611
Download: ML17317B158 (3)


Text

i2

~

R LATORY INFORMATION DISTRI ION SYSTEM (RIDS)

ACCESSION NBR:7905040611 DOC ~ DATE: 79/04/27 NOTARIZED:

NO DOCKET FAC IL'0 DONALD C ~

COOK NUCLEAR POWER PLANT F UNIT 1

F INDIANA 8 0500031 5 ONALD C ~

COOK NUCLEAR POWER PLANTF UNIT 2t INDIANA 8 05000316 AU

~

AUTHOR AFFILIATION SHALLERSD ~ V~:

INDIANA 8 MICHIGAN POWER CO ~

REC IP ~ NAME RECIPIENT AFfILIATION SCHWENCER

~ A ~

OPERATING REACTORS BRANCH 1

SUBJFCT-FORWARDS OPERATING HISTORY INFO RE PRESSURIZER POWER OPERATED RELIEF VALVES'N RESPONSE TO 790427 REQUESTS DISTRIBUTION CODE:

AODIS COPIES RECEIVED:LTR t

ENCL U SIZE:

TITLE: GENERAL DISTRIBUTION FOR AFTER ISSUANCE OF OPERATING LIC NOTES: '~'

Z <Q'5

'A'll tt L.

RECIPIENT ID CODE/NAME ACTION:

05 BC Og INTERNAL:

0 REG F

1 15 CORE PERF BR 17 ENGR BR 19 PLANiT SYS BR 21 EFLT" TRT SYS EXTERNAL: 03 LPDR 23 ACRS COPIES LTTR ENCL 7

7 1

1 2

2 1

1 1

1 1

1 1

1 1

1 16 ib RECIPIENT IO CODE/NAME 02 NRC PDR 14 TA/EOO 16 AD SYS/PROJ 18 REAC SFTY SR 20 EEB 22 BR INKMAN 04 NSIC

~

COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 1

1 She 7 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 38 ENCL 38

CL y~

INDIANA 8 MICHIGAN PO WFR COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49108 April 27, 1979 Donald C.

Cook Nuclear Plant Units No.

1 and 2

Docket Nos.

50/315 and 50/316 License Nos.

DPR-58 and DPR-74 Mr. A. Schwencer, Chief Operating Reactors Branch II1 Division of Operating Reactors U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Schwencer:

This letter transmits information shown on Attachment 1 of the operating history of Units 1

and 2 of the D. C.

Cook Plant regarding pressurizer power operated relief valves.

This information is sent in response to a verbal request received on April 27, 1979.

Very truly yours, BAS:pk D.

V. Shaller Plant Manager cc:

R.

W. Jurgensen

PRESSURIZER POWER OPERATED RELIEF VALVES D. C.

Cook Plant Units 1

5 2 UNIT 8 DATE REASON FOR OPENING DID VALVE RESPOND AS EXPECTED?

PRESSURE ONE 3/23/79, Y

Failure of Crid. I 8 II Vital Power Supply Inverters Yes 2365 TMO 9/22/78 Power Operated While Techs Mere Performing Calibration Test Yes, But Not At Normal Set-Dropped point from 2210 to 2185 ONE 1/02/74 Techs Caused RHR Let-down Valve to Close-Mhile Performing Test Valve Mas Opened Manually to Control Pressure Spike.

Reactor Coolant System was Being Operated as Solid System Pressure Spiked From 400 psig to 1000 psig ONE 6/26/75 Lost 2 Crids With S.I. Signal Yes 2335 ONE 12/24/76 Performing Tests Prior Depressurizing for Refueling Yes 2370 4-27-79