05000315/LER-1979-023-03, /03L-0 on 790326:portion of Circuitry for Rod K-10 Indication Was Shorted Rendering Channel Inoperable.Caused by Shorting Secondary Coil Voltage Terminals to Line Voltage Terminals at Rear of Indicator Panel.Measurement Revi

From kanterella
(Redirected from ML17317B138)
Jump to navigation Jump to search
/03L-0 on 790326:portion of Circuitry for Rod K-10 Indication Was Shorted Rendering Channel Inoperable.Caused by Shorting Secondary Coil Voltage Terminals to Line Voltage Terminals at Rear of Indicator Panel.Measurement Revised
ML17317B138
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 04/24/1979
From: Beilman T
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML17317B132 List:
References
LER-79-023-03L, LER-79-23-3L, NUDOCS 7904300303
Download: ML17317B138 (2)


LER-1979-023, /03L-0 on 790326:portion of Circuitry for Rod K-10 Indication Was Shorted Rendering Channel Inoperable.Caused by Shorting Secondary Coil Voltage Terminals to Line Voltage Terminals at Rear of Indicator Panel.Measurement Revised
Event date:
Report date:
3151979023R03 - NRC Website

text

U. S. NUCLEAR REGULATORY COMMISSION NRC FORM 366 L[CENSEE EVENT REPORT

~

s

/s CONTROL BLOCK:

Qi (PLEASE PRINT OR TYPE ALLREQUIRED INFORMATION)

I 6

[0D1)

M I

0 C

C 1

Qs 0

0 0

0 0

0 0

0 0

0 O

4 I

I I

1 O~ Qs 7

8 9

LICENSEE CODE 14 15 LICENSE NUMBER 25 26 LICENSE TYPF 30 57 CAT 58 CON'T

~oi

~QB O

5 O

O O

3 1

5 Q7 O

3 2

6 7

9 QB 0

4 2

4 7

9 Qs 7

8 SOURCE 60 61 DOCKET NUMBER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES ~10 WHILE TROUBLESHOOTING A PROBLEM ON XJ ADJACENT ROD POSITION INDICATION CIRCUIT

~Os

~04

~ss

~06 A PORTION OF THE CIRCUITRY FOR ROD K-10 INDICATION WAS INADVERTANTLY SHORTED RENDERING THE CHANNEL INOPERABLE.

ROD K-]0 INDICATION WAS RESTORED TO OPERABLE STATUS WITHIN THE TIME LIMIT SPECIFIED BY T.S. 3.1.3.2.

~O7

~OB 7

8

~OS 7

8 80 SYSTEM

CAUSE

CAUSE COMP.

VALVE CODE CODE SUBCODE COMPONENT CODE SUBCODE SUBCODE

~IE Q>>

A Qls

~BQls I

N S T

R U 8 LJS

~2 Os 9

10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION LF+RO EVENT XEAR REPORT NO.

CODE TYPE NO.

I p>>

REPORT ~s

+

~02 3

L~J LLJ U

U 21 22 23 24 26 27 28 29 31 32 ACTION FUTURE EFFECT SHUTDOWN ATTACHMENT NPRDQ PRIME COMP.

A COMPONENT TAKEN ACTION ON PLANT METHOD HOURS Q22 SUBMITTED FORM SUB.

SUPPLIER MANUFACTURER

~AQls ~MOls

[ gpss

~ZO

~O

~NOss

~NOss '<

I 2

0 Qss 33 34 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS +27 THE EVENT WAS CAUSED BY SHORTINGVHE SECONDARY COIL VOLTAGE TERMINALS TO THE LINE'OLTAGE TERMINALS AT THE REAR OF THE INDICATOR PANEL.

TO PREVENT RECURRENCE, THE METHOD OF OBTAINING VOLTAGE MEASUREMENTS HAS BEEN REVISED.

80

DESCRIPTION

32 80 LOCATION OF RELEASE QS6 44 80 80 80 80 NRC USE ONLY

~o 80 o 0

68 69 616-465-5901 T.

P. Beilman NAME OF PREPARER 4

7 8

9 FACILITY

~3O METHOD OF STATUS

% POWER OTHERSTATUS PQ DISCOVERY DISCOVERY s

E Qss ~ip 0 Qss N

~AQs>

OPERATIONAL EVENT 7

8 9

10 12 13 44 45 ACTIVITY CONTENT REL SED OF RELEASE AMOUNTOF ACTIVITYQ EKI w~O wzQ NA NA 7

8 9

10 11 45 PERSONNEL EXPOSURES 7

8 9

11 12 13 PERSONNEL INJURIES s ~0" oQs NA I D lE QQ Q

7 8

9 11 12 LOSS OF OR DAMAGETO FACILITY 43 TXPE

DESCRIPTION

~is pss NA 7

8 9

10 PUBLICITY ISSUED DESCRIPTION~

GIB <8 7

8 9

10

ir