ML17317A933

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-01, Environ Qualification of Class IE Equipment. W/List of 11 Systematic Evaluation Program Plants for Which No Action Is Required
ML17317A933
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 02/09/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER CO., INC.
References
NUDOCS 7902210185
Download: ML17317A933 (1)


Text

FEB 9

.379 l

,Docket No. 50-315 Socket No. 50-316 American Electric Power Service Corporation Indiana and Michigan Power Company ATTN:

Mr. John E. Dolan Vice Chairman Engineering and Construction 2 Broadway New York, NY 10004 Gentlemen:

Enclosed is IE Bulletin No. 79-01. It requires action by you with regard to power reactor facilities with an operating license except for the ll SEP plants which are listed in Enclosure 3.

This Bulletin is also being sent for information to the 11 SEP plants and all power reactor facilities with a construction permit.

No action or written response is required for construction permit facilities or the ll SEP plants.

Should you have questions regarding this Bulletin or the actions required of you, please contact this office.

Sincerely, James G. Keppler Director

Enclosures:

1.

IE Bulletin No. 79-01 2.

List of IE Bulletins Issued in the past 12 months 3.

List of SEP Plants (ll)

- cc w/encls:

Hr. D. -V Sheller, Plant

- Manager Central Piles

Director, NRR/DPM Local PDR NSICTIC;730RZJ

,,. oiss-OFHCE >

', 6URIIAllEW DATE~

RIIL Fiorell /bk Zg~V79 Ke~

r Citisens for a Better Envi onment NRC Form 318A (RZK) (5-76) NRCM 02040

~U. 5. GOVERNMENT PRINTING OFFICE:

1978-253 818