Category:CORRESPONDENCE-LETTERS
MONTHYEAR05000528/LER-1999-005, Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing1999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML17313B0811999-09-23023 September 1999 Forwards Exam Repts 50-528/99-301,50-529/99-301 & 50-530/99-301 on 990829-0903.Insp Included Evaluation of Five Applicants for Senior Operator Licenses ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3261999-09-13013 September 1999 Announces NRC C/A Program Insp at Plant for Wk of 991129. Insp Will Evaluate Effectiveness of Activities for Identifying,Resolving & Preventing Issues That Degrade Quality of Plant Operations ML17300B3671999-09-10010 September 1999 Documents Circumstances & Considerations Which Resulted in Request for & NRC Granting of Enforcement Discretion ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML17313B0451999-08-10010 August 1999 Informs That Info Submitted by Application Re CEN-630-P,Rev 2,submitted as Encl 4 to 990526 Application, Marked Proprietary,Will Be Withheld from Public Disclosure, Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 ML17313B0521999-08-0909 August 1999 Forwards Insp Repts 50-528/99-14,50-529/99-14 & 50-530/99-14 on 990613-0724.No Violations Noted ML17313B0581999-08-0606 August 1999 Forwards Rev 1 of Changes to TS Bases Implemented Between Aug 1998 & Jul 1999.Insertion Instructions & List of Affected Pages Included ML17313B0311999-08-0303 August 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML17313B0441999-07-30030 July 1999 Forwards Comments on Draft NRC Repts Evaluation of AOVs at Us Light-Water Reactors (1999) & Idaho Natl Engineering & Environ Lab Rept (INEEL)EXT-98-00383,Study of AOVs in Npps. ML17313B0431999-07-30030 July 1999 Advises of Listed Senior Mgt Changes That Have Taken Place at Plant ML17313B0091999-07-20020 July 1999 Forwards Requested Calculations Performed to Verify That Increase in Max Radially Averaged Enrichment for Fuel Assemblies from 4.3 Weight Percent to 4.8 Weight Percent Did Not Affect Requirements for TSs 3.7.15,3.7.17 & 4.3.1 ML17313B0151999-07-20020 July 1999 Submits Request to Obtain All Data Previously Sent by PVNGS & Currently in REIRS for OLs NPF-41,NPF-51 & NPF-74.Data Is Requested in Electronic Form (Ascii Format) as It Currently Exists in REIRS Sys ML17300B3111999-07-15015 July 1999 Forwards PVNGS Unit 2 ISI Rept for Eighth Refueling Outage. No Commitments Made to NRC by Ltr ML17300B3141999-07-15015 July 1999 Forwards Corrected Electronic Files for Individual Monitoring Repts for 1998.Original Electronic Files Were Found to Have Two Administrative Errors,Which Has Been Corrected.Encl Withheld,Per 10CFR2.790 ML20209G6771999-07-0808 July 1999 Forwards Supplemental Info to Confirm That Decommissioning Funding Plans of Public Service Co of Nm for Interests in PVNGS Have Been Reviewed by Nm Public Regulation Commission. Final Order & Recommended Decisions in Case 2742,also Encl ML17300B2931999-07-0202 July 1999 Submits Withdrawal of Relief 5 for Second ISI Interval for Units 1,2 & 3.Proposed Alternative Is Related to Exam Requirements for Component Supports for Second ISI Interval IR 05000528/19990121999-06-30030 June 1999 Forwards Insp Repts 50-528/99-12,50-529/99-12 & 50-530/99-12 on 990502-0612.Two Violations of NRC Requirements Occurred & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy ML17300B2831999-06-26026 June 1999 Requests NRC Approval of Proposed Alternative IAW Provisions of 10CFR50.55a(a)(3)(i) to 10CFR50.55a(g) & Requirements of ASME Boiler & Pressure Vessel Code Section XI for Repairs & Installation.Description of Proposed Alternative,Encl ML17313A9951999-06-26026 June 1999 Provides Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants ML17313A9971999-06-25025 June 1999 Forwards EA & Fonsi Re 980609 Application,As Supplemented by ML17313A9901999-06-15015 June 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. No Commitments Being Made to NRC by Ltr ML17313A9741999-06-11011 June 1999 Forwards Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML17313A9871999-06-0909 June 1999 Ack Receipt of Re Changes to Plant Emergency Plan Rev 20.No Violations of 10CFR50.47(b) Were Identified ML17313A9661999-06-0707 June 1999 Forwards Notice of Withdrawal of Application for Amends to FOLs in Response to Withdrawal of Amend Request on 981218. Proposed Amends Would Have Modified Facility TS to Provide Method to Respond to Sustained,Degraded Voltage Condition ML17313A9521999-05-24024 May 1999 Notifies NRC That Ja Proctor,License SOP-50314,has Been Permanently Reassigned to Position That Does Not Require License.License Should Be Expired,Per 10CFR55.55 ML17313A9431999-05-19019 May 1999 Forwards Insp Repts 50-528/99-09,50-529/99-09 & 50-530/99-09 on 990503-07.No Violations Noted.Inspector Determined That Radiological Environmental Monitoring & Meteorological Monitoring Program Effectively Implemented ML20206Q3111999-05-18018 May 1999 Final Response to FOIA Request for Documents.Forwards App a Records Being Released in Entirety ML17313A9361999-05-18018 May 1999 Forwards Insp Repts 50-528/99-06,50-529/99-06 & 50-530/99-06 on 990321-0501.Three Violations of NRC Requirements Identified as Being Treated as Noncited Violations, Consistent with App C of Enforcement Policy ML17313A9311999-05-13013 May 1999 Notifies NRC That Rev 2 to COLR for Unit 2 Remains Applicable Following Recently Completed Unit 2 Reload ML17313A9481999-05-12012 May 1999 Informs of Change Needed in Order to Update Current Mailing List.Future Mailings for J Horne Should Be Forwarded to Listed Address ML17313A9141999-05-0606 May 1999 Forwards Results of Gfes of Written Operator Licensing Exam Administered on 990407 to Nominated Employees of Facility. Requests That Training Dept Forward Individual Answer Sheets & Results to Appropriate Individuals.Without Encl ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML17313A9191999-04-30030 April 1999 Forwards Special Rept 2-SR-99-001 Re SG Tube Plugging in PVNGS Unit 2,per TS Reporting Requirement 5.6.8.Complete Results of SG Tube Inservice Insp Will Be Submitted by 000422 ML17313A9181999-04-30030 April 1999 Forwards Electronic File of Individual Monitoring Repts for 1998.Encl Withheld Per 10CFR2.790 ML17313A9091999-04-30030 April 1999 Forwards Proprietary Proposed Test Outlines for Initial License Exams to Be Administered at PVNGS in Aug/Sept 1999. No Commitments Are Contained in Ltr.Proprietary Info Withheld ML17313A9041999-04-28028 April 1999 Expresses Appreciation for Opportunity to Participate in Preparation of EIS to Assess Environ Impacts of Const of Transmission Line from PVNGS Switchyard Across US-Mexico Border.Nrc Does Not Have Licensing Activity Re Action 05000529/LER-1999-003, Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool1999-04-23023 April 1999 Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool ML17313A9081999-04-23023 April 1999 Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531 ML17313B0271999-04-21021 April 1999 Forwards Proprietary Epec Pro Forma Cashflow Statement for 1999.Proprietary Info Withheld,Per 10CFR2.790.Affidavit Encl 1999-09-08
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML17313B0811999-09-23023 September 1999 Forwards Exam Repts 50-528/99-301,50-529/99-301 & 50-530/99-301 on 990829-0903.Insp Included Evaluation of Five Applicants for Senior Operator Licenses ML17300B3261999-09-13013 September 1999 Announces NRC C/A Program Insp at Plant for Wk of 991129. Insp Will Evaluate Effectiveness of Activities for Identifying,Resolving & Preventing Issues That Degrade Quality of Plant Operations ML17300B3671999-09-10010 September 1999 Documents Circumstances & Considerations Which Resulted in Request for & NRC Granting of Enforcement Discretion ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML17313B0451999-08-10010 August 1999 Informs That Info Submitted by Application Re CEN-630-P,Rev 2,submitted as Encl 4 to 990526 Application, Marked Proprietary,Will Be Withheld from Public Disclosure, Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 ML17313B0521999-08-0909 August 1999 Forwards Insp Repts 50-528/99-14,50-529/99-14 & 50-530/99-14 on 990613-0724.No Violations Noted ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams IR 05000528/19990121999-06-30030 June 1999 Forwards Insp Repts 50-528/99-12,50-529/99-12 & 50-530/99-12 on 990502-0612.Two Violations of NRC Requirements Occurred & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy ML17313A9971999-06-25025 June 1999 Forwards EA & Fonsi Re 980609 Application,As Supplemented by ML17313A9741999-06-11011 June 1999 Forwards Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML17313A9871999-06-0909 June 1999 Ack Receipt of Re Changes to Plant Emergency Plan Rev 20.No Violations of 10CFR50.47(b) Were Identified ML17313A9661999-06-0707 June 1999 Forwards Notice of Withdrawal of Application for Amends to FOLs in Response to Withdrawal of Amend Request on 981218. Proposed Amends Would Have Modified Facility TS to Provide Method to Respond to Sustained,Degraded Voltage Condition ML17313A9431999-05-19019 May 1999 Forwards Insp Repts 50-528/99-09,50-529/99-09 & 50-530/99-09 on 990503-07.No Violations Noted.Inspector Determined That Radiological Environmental Monitoring & Meteorological Monitoring Program Effectively Implemented ML17313A9361999-05-18018 May 1999 Forwards Insp Repts 50-528/99-06,50-529/99-06 & 50-530/99-06 on 990321-0501.Three Violations of NRC Requirements Identified as Being Treated as Noncited Violations, Consistent with App C of Enforcement Policy ML20206Q3111999-05-18018 May 1999 Final Response to FOIA Request for Documents.Forwards App a Records Being Released in Entirety ML17313A9141999-05-0606 May 1999 Forwards Results of Gfes of Written Operator Licensing Exam Administered on 990407 to Nominated Employees of Facility. Requests That Training Dept Forward Individual Answer Sheets & Results to Appropriate Individuals.Without Encl ML17313A9041999-04-28028 April 1999 Expresses Appreciation for Opportunity to Participate in Preparation of EIS to Assess Environ Impacts of Const of Transmission Line from PVNGS Switchyard Across US-Mexico Border.Nrc Does Not Have Licensing Activity Re Action ML20205T7421999-04-21021 April 1999 Forwards Partially Withheld Insp Repts 50-528/99-05, 50-529/99-05 & 50-530/99-05 on 990322-26.Determined That Security Program Properly Implemented.Insp Repts Details Withheld (Ref 10CFR73.21) NUREG-0857, Forwards SER Accepting Licensee 950309 Request to Withdraw Proposed Charging Sys/Auxiliary Pressurizer Spray Sys Hardware Mods Committed to in Licensee1999-03-23023 March 1999 Forwards SER Accepting Licensee 950309 Request to Withdraw Proposed Charging Sys/Auxiliary Pressurizer Spray Sys Hardware Mods Committed to in Licensee ML17313A8611999-03-18018 March 1999 Forwards Insp Repts 50-528/98-10,50-529/98-10 & 50-530/98-10 on 981227-990206.No Violations Noted ML17313A8531999-03-17017 March 1999 Discusses GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML17313A8421999-03-0808 March 1999 Forwards SE Accepting Licensee Proposed Alternative to Section III of ASME Boiler & Pressure Code IAW 10CFR50.55a(a)(3).Proposed Alternative Is Part of Design Mod to Chemical & Vol Control Sys to Improve Sys Performance ML17313A8211999-02-22022 February 1999 Forwards Insp Repts 50-528/99-03,50-529/99-03 & 50-530/99-03 on 990125-29.No Violations Noted.Nrc Determined That Releases of Radioactive Effluents Controlled,Monitored & Quantified Well ML17313A8041999-02-18018 February 1999 Informs That in 990316 Telcon Between F Reidel & T Mckernon, Arrangements Made for Administration of Licensing Exams at Palo Verde Nuclear Generating Station During Week of 990830 ML17313A8201999-02-16016 February 1999 Ack Receipt of Ltr & Encl Scenario for Palo Verde Nuclear Generating Station Biennial Exercise. Determined That Exercise Appropriate to Meet Emergency Plan Requirements ML17313A7751999-02-0505 February 1999 Discusses Proposed Changes to PVNGS Emergency Plan Submitted by Licensee on 980908.Rev Would Result in Two Less Radiation Protection Positions Immediately Available During Emergencies.Forwards SE Supporting Proposed Changes ML20202J4891999-02-0202 February 1999 First Final Response to FOIA Request for Records.Records in App a Available in PDR ML17313A7731999-02-0202 February 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section for Written Operator Licensing Exam at Util Facility on 990407.Authorized Representative from Facility Must Submit Listing of Names of Candidates for Exam ML17313A7721999-02-0101 February 1999 Advises That Info Provided in from Azps, Pro Forma Cashflow Statement of 1998, for El Paso Electric Co, Marked Proprietary,Will Be Withheld from Public Disclosure, Per 10CFR2.790(a)(4) & Section 103(b) of AEA of 1954 ML17313A7601999-01-14014 January 1999 Provides Summary of 981209-10 CEOG Resource Sharing Task Force Meeting in Litchfield Park,Arizona Re Results of Two Recently Completed Safety Sys Functional Assessments That Were Conducted at ANO Unit 2 & Calvert Cliffs in 1998 ML17313A7371999-01-13013 January 1999 Ack Receipt of Forwarding Objectives for PVNGS 1999 Emergency Plan Exercise Scheduled for Mar 1999.Informs That Based on Review,Nrc Determined That Exercise Objectives Appropriate to Meet Emergency Plan Requirements ML17313A7301998-12-29029 December 1998 Informs That on 981202,NRC Staff Completed Insp Planning Review (Ipr) of PVNGS & Advises of Planned Insp Effort Resulting from Ipr.Forwards Historical Listing of Plant Issues Since 971001,referred to Plant Issues Matrix (PIM) ML20196D6291998-11-20020 November 1998 Forwards Insp Repts 50-528/98-13,50-529/98-13 & 50-530/98-13 on 981019-24 & NOV Re Improper Changes to Physical Security Plan ML17313A6871998-11-18018 November 1998 Provides Summary of 981110 Meeting Held in Arlington,Texas Re Operations Performance,Challenges & Improvements at Palo Verde Nuclear Generating Station.Copy of Licensee Meeting Presentation Package Encl ML17313A6721998-11-0606 November 1998 Forwards Region IV Organization Chart.Closure Completed on 980930 IR 05000528/19980051998-09-25025 September 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-528/98-05, 50-529/98-05 & 50-530/98-05 Issued on 980810.Review Found Reply Responsive to Concerns Raised in Notice of Violation ML18066A2981998-09-23023 September 1998 Forwards RAI Re GL 97-01 Degradation of Cibtrol Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations Responses for Plant & Relationship of Responses to Topical Report CE NPSD1085 ML17313A5981998-09-15015 September 1998 Ack Receipt of 980806 Response to Violations Noted in Investigation Repts 4-97-022S & 4-98-014 ML17313A5991998-09-15015 September 1998 Ack Reciept of 980806 Response to Violations Noted in Investigation Repts 4-97-022S & 4-98-014 ML20151X2321998-09-0909 September 1998 Ack Receipt of & Check for $50,000 in Payment for Civil Penalty Proposed in NRC ML17313A5641998-09-0202 September 1998 Forwards Insp Repts 50-528/98-15,50-529/98-15 & 50-530/98-15 on 980521-0630.No Violations Noted.Insp Followed Letdown Line Crack & Leak of Reactor Coolant.Insp Determined That Appropriate Prompt C/A Were Taken by Licensee Personnel ML17313A5581998-08-31031 August 1998 Discusses Closeout of GL 97-05, SG Tube Insp Techniques, for Palo Verde Nuclear Generating Station ML17313A5311998-08-10010 August 1998 Forwards Insp Repts 50-528/98-05 & 50-529/98-05 & 50-530/98-05 & Notice of Violation Re Failure of Personnel to Maintain Configuration Controls for Locked safety-related Valve,As Required by Procedure ML20236U9241998-07-28028 July 1998 Final Response to FOIA Request for Documents.Records Subj to Request Encl & Identified in App A.App B Records Being Withheld in Part (Ref FOIA Exemption 7) ML17313A5121998-07-22022 July 1998 Informs That APS 980604 Submittal Providing Addl Info in Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions, to Be Withheld Ref 10CFR2.790(b)(5) ML20236N2291998-07-10010 July 1998 Discusses Investigation Repts 4-97-022S & 4-98-014 Completed on 980213,predecisional EC Conducted on 980331 & Forwards Notice of Violation Re Falsification of Surveillance Test Record at Plant ML17313A4921998-07-10010 July 1998 Discusses Investigation Repts 4-97-022S & 4-98-014 Completed on 980213,predecisional EC Held on 980331 & Forwards Notice of Violation Re Apparent Falsification of Surveillance Test Record on or About 930310 ML20236N0331998-07-10010 July 1998 Discusses Investigation Repts 4-97-022S & 4-98-014 on 980331 & Forwards NOV & Proposed Imposition of Civil Penalty in Amount of $50,000 ML17313A5011998-07-10010 July 1998 Forwards Insp Repts 50-528/98-04,50-529/98-04 & 50-530/98-04 on 980419-0530.No Violations Noted.Insp Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Controls ML17313A4841998-07-0202 July 1998 Discusses Graded Quality Assurance Initiative & Closes TACs M92447,M92448 & M92449 1999-09-23
[Table view] |
See also: IR 05000528/1999301
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
il i CCESSION NBR:9909280052
DOC.DATE: 99/09/23
NOTARIZED: NO
DOCKET
ACIL':STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi
05000528
STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi
05000529
STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi
05000530
AUTH.NAME
AUTHOR AFFILIATION
PELLET,J.L.
Region
4 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
OVERBECK,G.R.
Arizona Public Service
Co.
(formerly Arizona Nuclear Power
SUBJECT:
Forwards
exam repts 50-528/99-301,50-529/99-301
&,
50-530/99-301
on 990829-0903.Insp
included evaluation .of
five applicants for senior operator licenses.
DISTRIBUTION CODE: IE42F
COPIES
RECEXVED:LTR
ENCL
SIZE:
TITLE: Operator Licensing Examination Reports
NOTES:STANDARDIZED PLANT
Standardized plant.
Standardized plant.
05000528
05000529
05000530
RECIPIENT
ID CODE/NAME
LPD4-2
XNTERNAL: ACRS
NRR/DIPM/OLHP
'ERNAL: NOAC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
KALYANAM,N
FILE CENTER
RGN4~PX.LE
0'1
NRC PDR
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LIS
e
OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION
CONTACT THE DOCUMENT CONTR
DESK
(DCD)
ON EXTENSION 415-2083
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
8
ENCL
8
ggfl Aggg
(4
(~
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION Iv
611 RYAN PLAZADRIVE, SUITE 400
ARLINGTON,TEXAS 76011-8064
SEP
2 3
I999
Gregg R. Overbeck, Senior Vice
President, Nuclear
Arizona Public Service Company
P.O. Box 52034
Phoenix, Arizona 85072-2034
SUBJECT:
NRC INSPECTION REPORT NO. 50-528/99-301; 50-529/99-301; 50-530/99-301
Dear Mr. Overbeck:
This refers to the inspection conducted on August 29 through September 3, 1999, at the Palo
Verde Nuclear Generating Station, Units 1, 2, and 3 facilities.
The enclosed report presents
the results of this inspection.
TI1e inspection included an evaluation of five applicants for senior operator licenses.
We
determined that all applicants satisfied the requirements of 10 CFR Part 55, and the appropriate
licenses'ave
been issued.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure willbe placed in the NRC Public Document Room (PDR).
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
John L. Pellet, Chief
Operations Branch
Division of Reactor Safety
Docket Nos.:
50-528; 50-529; 50-530
License Nos.: NPF-41; NPF-51; NPF-74
Enclosure:
NRC Inspection Report No.
50-528/99-301; 50-529/99-301; 50-530/99-30,1
9909280052
990923
PDR
ADOCK 05000528
V
PDR
Arizona Public Service Company
-2-
cc w/enclosure (w/Attachments
1 to 3):
Mike Shea, Director, Nuclear Training
Palo Verde Nuclear Generating Station
Arizona Public Service Company
P.O. Box 52034, Mail Sta. 6156
Phoenix, Arizona
cc w/enclosure (w/Attachments
1 and 2 only):
Steve Olea
Arizona Corporation Commission
1200 W. Washington Street
'hoenix,
Arizona 85007
Douglas K. Porter, Senior Counsel
Southern California Edison Company
Law Department, Generation Resources
P.O. Box 800
Rosemead,
California 91770
Chairman
Maricopa County Board of Supervisors
301 W. Jefferson, 10th Floor
Phoenix, Arizona 85003
Aubrqy V. Godwin, Director
Arizona Radiation Regulatory Agency
4814 South 40 Street
Phoenix, Arizona 85040
Angela K. Krainik, Director
Regulatory Affairs
Arizona Public Service Company
P.O. Box 52034
Phoenix, Arizona 85072-2034
John C. Horne, Vice President,
Power Generation
El Paso Electric Company
2702 N. Third Street, Suite 3040
Phoenix, Arizona 85004
Terry Bassham,
Esq.
General Counsel
El Paso Electric Company
123 W. Mills
El Paso, Texas
79901
Arizona Public Service Company
John W. Schumann
Los Angeles Department of Water & Power
Southern California Public Power Authority
P.O. Box 51111, Room 1255-C
Los Angeles, California 90051-0100
David Summers
Public Service Company of New Mexico
414 Silver SW, ¹1206
Albuquerque, New Mexico 87102
Jarlath Curran
Southern California Edison Company
5000 Pacific Coast Hwy. Bldg. DIN
San Clemente, California 92672
Robert Henry
Salt River Project
6504 East Thomas Road
Scottsdale, Arizona 85251
1
'
'I
iJ
e
j
!
Arizona Public Service Company
-4-
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
bcc to DCD~OE42i
cc w/enclosure (w/Attachments
1 and 2 only):
Regional Administrator
Palo Verde Resident Inspector
DRP Director
RIV File
DRS Director
RITS Coordinator
Branch Chief (DRP/D)
Senior Project Inspector (DRP/D)
bcc w/enclosure and Attachments 1-3:
L. Hurley, OLA
D. Trimble, Section Chief, HOLB
DOCUMENT NAME: R:< PNPV9301RP.tom.wpd
To receive co
of document. indicate in box: "C" = Co
without enclosures
"E" = Co
viith enclosures "N = No co
RIV:SRE:OB
TOMcKerno /I
,09
99
C:OB
SRE:OB
DRP:BrD:C
JLPellet
~
09
99
GWJohnsto
09
9
PHHarrell
09/999
OFFICIAL RECORD COPY
C:OB
JLPellet
0~~9
Arizona Public Service Company
-4-
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
bcc to DCD (IE01)(IE42)
cc w/enclosure (w/Attachments
1 and 2 only):
Regional Administrator
Palo Verde Resident Inspector
DRP Director
. RIV'File
DRS Director
RITS Coordinator
Branch Chief (DRP/D)
Senior Project Inspector (DRP/D)
bcc w/enclosure and Attachments 1-3:
L. Hurley, OLA
D. Trimble, Section Chief, HOLB
DOCUMENT NAME: R: i PNPV9301RP.tom.wpd
To receive co
of document, Indicate Inbox: "C" = Co
without enclosures
"E" = Co
with enclosures
N = Noco
RIV:SRE:OB
SRE:OB
C:OB
ii
DRP:BrD:C
C:OB
TOMcKerno
I
09
99
GWJohnsto
09
9
JLPellet '
9
PHHarrell
09/+99
JLPellet
0M+9
0
OFFICIAL RECORD COPY
'I
0