ML17313A593
| ML17313A593 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 09/16/1998 |
| From: | James M. Levine ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 102-04183-JML-A, 102-4183-JML-A, 50-528-98-05, 50-528-98-5, NUDOCS 9809220313 | |
| Download: ML17313A593 (2) | |
Text
CA.J AM&~x i.
REGULATORY INFORMATION DISTRXBUTION SYSTEM (RXDS)
ACCESSION NBR:9809220313 DOC.DATE: 98/09/16 NOTARIZED: NO DOCKET ACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 AUTH.NICE
. 'UTHOR AFFILIAT10N EVXNE,J.M.
" Arizona Public Service Co.
(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control. Desk)
SUBJECT:
Corrected response to violations noted in insp rept
.50-528/98-05.Corrective actions:training will be completed prior to 990331.
DISTRIBUTION CODE:
IEOID COPIES RECEIVED:LTR I
ENCL 0 SIZE:
I TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES: STANDARDIZED PLANT RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: ACRS AEOD/T CENTE NRR/DRPM/PECB NUDOCS-ABSTRACT OGC/HDS2 COPIES LTTR ENCL RECIPIENT ID CODE/NAME FIELDS,M AEOD/SPD/RAB DEDRO NRR/DRCH/HOHB NRR/DRPM/PERB OE DIR RGN4 FILE 01 COPIES LTTR ENCL 05000528 G
0 ERNAL: LITCO BRYCE,J H NRC PDR NOAC NUDOCS FULLTEXT NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROZ DESK (DCD)
ON EXTENSION 415-2083 II TOTAL NUMBER OF COPIES REQUIRED:
LTTR 19 ENCL
Palo Verde Nuclear Generating Station James M. Levine Senior Vice President Nuclear TEL (602)393-5300 FAX (602)393-6077 Mail Station 7602 P.O. Box 52034 Phoenix, AZ 85072-2034 U. S. Nuclear Regulatory Commission ATlN: Document Control Desk Mail Station: P1-37 Washington, DC 20555-0001 102-04182-JML/AKK/DLK September 16, 1998
Reference:
Letter 102-04176, dated September 6, 1998 from J. M. Levine, APS, to USNRC, "Reply to Notice ofViolation 50-528/98-05-01."
Dear Sirs:
'ubject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 1 Docket Nos. STN 60-528 Correction to Reply to Notice ofViolation 50-628/98-05-01 Arizona Public Service Company's reply to Notice of Violation 50-528/98-05-01 referenced an incorrect date in the section titled "Corrective Steps That Will Be Taken To Avoid Further Violations."
The sentence "The training will be completed prior to March 31, 1998" on page 2 of enclosure 2 should read "The training will be completed prior to March 31, 1999."
Should you have any questions, please contact Ms. Angela K. Krainik at (602) 393-5421.
Sincerely,
~~~p-JML/AKK/DLK/rlh cc:
E. W. Merschoff M. B. Fields J. H. Moorman 980'9220313 980916 PDR ADGCK 0500052S 8