ML17313A545

From kanterella
Jump to navigation Jump to search
Responds to 980624 Ltr Requesting Addl Info Re Response to GL 96-06.Addl Info Originally Requested to Be Submitted by 980821,will Be Submitted by 980918.Addl Time Required to Provide Complete & Accurate Response
ML17313A545
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/20/1998
From: James M. Levine
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
102-04169-JML-S, 102-4169-JML-S, GL-96-06, GL-96-6, NUDOCS 9808240182
Download: ML17313A545 (4)


Text

CATEGORY j.

REGULATORY INFORMATION DISTRIBUTIONSYSTEM (RIDS)

ACCESSION NBR:9808240182 DOC.DATE: 98/08/20 NOTARIZED: NO DOCKET ¹ FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-929 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION LEVINE,J.M. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIAT10N Records Management Branch (Document Control Desk)

SUBJECT:

Responds to 980624 ltr requesting addi info re response to GL 96-06.Addi info originally requested to be submitted by A 980821,will be submitted by 980918.Addi time required to provide complete S accurate response. T DISTRIBUTION CODE: A072D TITLE: GL COPIES RECEIVED:LTR 96-06, "Assurance of Equip Oprblty S ENCL 0 SIEE:during Design E 1Contain.Integ. 1 Q

NOTES: STANDARDIZED PLANT 05000528 Standardized plant. 0500052P Standardized plant. 05000530 R

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL NRR/WETZEL,B. PD4-2 PD FIELDS,M

- INTERNAL ILE CENTER 01 NRR/DE/EMEB D SA SB NRR/DSSA/SPLB D

EXTERNAL: NOAC NRC PDR 0

C NOTE TO ALL MRIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL

0 I

l I

t

James M. Levine 'TEL (602)393.5300 Mail Station 7602 Palo Verde Nuclear Senior Vice President FAX (602)393-6077 P.O. Box 52034 Generating Station Nuclear Phoenix, AZ 85072-2034 102-04169-JML/SAB/RMW August 20, 1998 U. S. Nuclear Regulatory Commission ATl N: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3, Docket Nos. STN 50-528/529/530 Schedule for Response to Request for Additional information Regarding Generic Letter 96-06, "Assurance of Equipment Operability and Containment Integrity During Design Basis Accident Conditions".

By letter dated June 24, 1998, the NRC requested additional information regarding Arizona Public Service Company's (APS) response to Generic Letter 96-06. APS will provide the additional information that was originally requested to be submitted by August 21, 1998, by September 18, 1998. Additional time is required to provide a complete and accurate response that will fully address the questions and issues identified in the NRC request.

Please contact Mr. Scott Bauer at (602) 393-5978 if you have any questions or would like additional information regarding this matter.

Sincerely, JML/SAB/RMW/rlh cc: E. W. Merschoff M. B. Fields J. H. Moorman

'P808240i82 980820 PDR ADOCK,05000528 P

~ -PDR I

l I

~r