Informs That PVNGS Plans to Continue Participating in Joint Owners Group MOV Periodic Verification Program,In Response to GL 96-05.Licensee Plans to Implement Program Elements Described in TR NEDC-32719,Rev 2,as Amended by SE
ML17313A515
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/19/1998
From: James M. Levine
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
102304152-JML-S, GL-96-05, GL-96-5, NUDOCS 9807290126
Download: ML17313A515 (6)


Text

CATEGORY 1 I

~ ~

.)g REGULA RY INFORMATION DISTRIBUTION~ SYSTEM (RIDS) l ACCESSION NBR:9807290126 DOC.DATE: 98/07/19 NOTARIZED: NO DOCKET ¹ FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 SM-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME LEVINE,J.M.

'UTHOR

'rizona AFFILIATION Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)

SUBJECT:

Informs that PVNGS plans to continue participating in Joint Ownwer Group MOV-periodic verification program, in response A to GL 96-05.Licensee plans to implement program elements described, in TR NEDC-32719,Rev 2,as amended by SE. T DISTRIBUTION CODE: A073D COPIES RECEIVED:LTR ENCL SIZE: E TITLE: GL-96-05 Periodic Verif. of Design Basis Capability of Safety-Related G

NOTES: STANDARDIZED PLANT 05000528 Standardized plant. 05000529 p Standardized plant. 05000530 R

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD FIELDS,M INTERNAL: ACRS AEOD/SOD/RAB I NRR/DE/EMEB NRR/HANSEN, A RES/DET/EIB/B RES/DST RES/DST/PRAB D EXTERNAL: NOAC 1 1 NRC PDR U

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 12 ENCL

~ I James M. Levine TEL (602)393-5300 Mail Station 7602 Palo Verde Nuclear Senior Vice President FAX (602)393-6077 P.O. Box 52034 Generating Station Nuclear Phoenix, AZ 85072-2034 102-04152-JML/SAB/MLG July 19,1998 U S Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington DC 20555-0001

Reference:

(a) Safety Evaluation on Joint Owners'roup Program on Periodic Verification'of Motor-Operated Valves Described in Topical Report NEDC-32719 (Revision 2), dated October 30, 1997 (b) Generic Letter 96-05, "Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves", dated September 18, 1996

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2 and 3 Docket Nos. STN 50-528/529/530 Response to Safety Evaluation for Joint Owners'roup Program on Periodic Verification of Motor-Operated Valves (in response to Generic Letter 96-05)

Dear Sirs:

L On October 30, 1997, the Nuclear, Regulatory Commission (NRC) issued reference (a) which, within the conditions and limitations described in the Safety Evaluation (SE), stated that the NRC considers the Joint Owners'"Group (JOG)

Program on MOV Periodic Verification an acceptable industry-wide response to Generic Letter (GL) 96-05.

The JOG had agreed that after issuance of the SE, requests would be made for participating utilities to notify the NRC of their plans to implement the JOG program and justify any deviations from the JOG program.

OQC o

'F8072'POi26 980719 PDR ADOCK 05000528

! p "

PDR

~ l

(%

V 4

P U S Nuclear Regulatory Commission Response to Safety Evaluation-Joint Owners'roup Program on Periodic Verification of Motor-Operated Valves (in response to Generic Letter 96-05)

Page 2 PVNGS plans to continue participating in the JOG MOV-Periodic Verification Program as a member of the GEOG and plans to implement the program elements described in Topical Report NEDC-32719, Revision 2 as amended by the SE with the following exception:

Table 4-1 of the Topical Report shows the risk and margin categories for static diagnostic testing frequency during the interim periodic test program.

The PVNGS interim test program does not meet the frequencies specified in Table 4-1. PVNGS does not currently use any risk ranking criteria in the establishment of static test frequency.

PVNGS utilizes a train-related outage scheduling system in which the majority of A-train maintenance and testing is performed during an A-train outage, and B-train maintenance and testing is performed during a B-train outage. As such, static diagnostic testing is normally performed on a 2 cycle frequency. Some static testing has been extended for a 3rd cycle to align the testing with the train-related outage philosophy. This philosophy meets the testing guidelines specified in GL 89-10.

In cases where the as-found testing reveals that the actuator did not supply the required thrust/torque, the situation is evaluated in accordance with the station Condition Report/Disposition Report (CRDR) process. The impact of the as-found condition is evaluated on a case-by-case basis to ensure that the actuator has sufficient margin to remain operable until the next scheduled test regardless of the risk categorization of the valve/actuator.

The as-left settings may be increased to ensure the available margin, or the test frequency could be shortened. The performance history of MOV's at Palo Verde has been such that no valve/actuators have required static testing to be increased to every refueling outage. Based on the performance history and compliance with the original GL 89-1 0 requirements, PVNGS believes this exception to be justified.

In the future, the static diagnostic test frequency may be extended past the current 2 cycle test frequency, however, this determination will be based on the past performance of the valve/actuator and the available margin. The risk categorization of the valve/actuator, when completed, may be considered as additional support for extending the test frequency, but will not be the primary factor.

Apart from the JOG effort, PVNGS uses the existing static diagnostic testing program and the MOV performance trending program to monitor the thrust and torque delivered by the actuator. Other test methodologies such as motor power

N 1'

0 US Nuclear Regulatory Commission Response to Safety Evaluation-Joint Owners'roup Program on Periodic VeriTication of Motor-Operated Valves Page 3 monitoring and use of a torque test stand are being investigated as possible enhancements to the existing program.

The existing program of preventive maintenance, static diagnostic testing, MOV performance trending, and participation in the JOG test program meets the requirements of GL 96-05.

Commitments Made in this Letter PVNGS plans to continue participating in the JOG MOV-Periodic Verification Program as a member of the GEOG and plans to implement the program elements described in Topical Report NEDC-32719, Revision 2 as amended by the SE with the above noted exception.

Please contact Mr. Scott Bauer at (602) 393-5978 if you have any questions or would like additional information regarding this matter.

Sincerely, JML/SAB/MLG/rlh CC: