ML17313A388

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-528/98-03,50-529/98-03 & 50-530/98-03 on 980308-0418 & NOV Re Failure to Obtain Appropriate Authorization Prior to Initiation of Work on EDG
ML17313A388
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 05/22/1998
From: Harrell P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: James M. Levine
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17313A389 List:
References
50-528-98-03, 50-528-98-3, 50-529-98-03, 50-529-98-3, 50-530-98-03, 50-530-98-3, NUDOCS 9806010313
Download: ML17313A388 (12)


See also: IR 05000528/1998003

Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CESSXON NBR:9806010313

DOC.DATE- 98/05/22

NOTARIZED: NO

DOCKET

CIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi

05000528

STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi

05000529

STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi

05000530

AUTH.NAME

AUTHOR AFFILIATION

HARRELL,P.H.

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

LEVINE,J.'M.

Arizona Public Service

Co.

(formerly Arizona Nuclear Power

SUBJECT:

Forwards insp repts 50-528/98-03,50-529/98-03

& 50-530/98-03

A

on 980308-0418

& NOV re failure to obtain appropriate

authorization prior to initiation of work on EDG.

T

DTSTRTBUTTON CODE:

IE01F

COPTER

RECETVED:LTR

l

ENCL

(

STZE: g +

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation 'Response

NOTES: STANDARDIZED PLANT

Standardized plant.

Standardized plant.

RECIPIENT

ID CODE/NAME

PD4-2

PD

COPIES

LTTR ENCL

1

1

RECXPIENT

ID CODE/NAME

FIELDS,M

COPIES

LTTR ENCL

1

.

1

05000528

05000529G

05000530

R

INTERNAL: ACRS

AEO~D

XLE CENTE

/DR

PECB

NUDOCS-ABSTRACT

OGC/HDS2

2

.

2

1

1

1

1

1

1

1

1

1

1

AEOD/SPD/RAB

DEDRO

NRR/DRCH/HHFB

NRR/DRPM/PERB

= OE DIR

RGN4

FILE

01

1

1

1

.

1

1

1

1

1

1

1

1

1

C

EXTERNAL

LITCO BRYCE F J H

NRC PDR

1

'1

1'

NOAC

NUDOCS FULLTEZT

1

1

1

1

I.QQQEQ wejM

,, <~RCPI OPPV

NOTE TO ALL NRIDS"'RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LIST

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTRO

DESK

(DCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

19,.

ENCL

19

I

i!

V

1j

l

(

I

qn~ 4<CV.

fp0

kp

+>>*++

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

MAY 22 l998

James M. Levine, Senior Vice

President, Nuclear

Arizona Public Service Company

P.O. Box 53999

Phoenix, Arizona 85072-3999

SUBJECT: NRC INSPECTION REPORT 50-528/98-03; 50-529/98-03; 50-530/98-03 AND

NOTICE OF VIOLATION

Dear Mr. Levine:

From March 8 through April 18, 1998, a routine inspection was conducted at your Palo Verde

Nuclear Generating Station, Units 1, 2, and 3 reactor facilities. The enclosed report presents the

scope and results of that inspection.

During the 6-week period covered by this inspection, your conduct of activities at the Palo Verde

facilitywas generally characterized by safety-conscious

operations, sound engineering and

maintenance practices, and careful radiological controls; however, violations of NRC

requirements were Identified.

The first violation involves the failure to obtain appropriate authorization prior to initiation of work

on the emergency diesel generator.

The second violation represents

a failure to provide

appropriate procedural criteria for determining the minimum level in the transfer canal for

movement of spent fuel.

These violations are cited in the enclosed Notice of Violation (Notice) and the circumstances

surrounding the violations are described in detail in the enclosed report. Please note that you

are required to respond to this letter and should followthe instructions specified in the enclosed

Notice when preparing your response.

The NRC'will use your response,

in part, to determine

whether further enforcement action is necessary to ensure compliance with regulatory

requirements.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its

enclosure(s),

and your response will be placed in the NRC Public Document Room (PDR).

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.

'P8060i0313

980522

PDR

ADQCK 05000528

8

PDR

0

II

II,

Arizona Public Service Company

-2-

Sincere,

P.

Pro

Divi

Harrell, Chief

cts Branch D

ion of Reactor Projects

Docket Nos.:

50-528

50-529

50-530

License Nos.: NPF-41

NPF-51

.

NPF-74

Enclosures:

1.

Notice of Violation

2.

NRC Inspection Report

50-528/98-03; 50-529/98-03; 50-530/98-03

cc w/enclosures:

Mr. Steve Olea

Arizona Corporation Commission

1200 W. Washington Street

Phoenix, Arizona 85007

Douglas K. Porter, Senior Counsel

Southern California Edison Company

Law Department, Generation Resources

P.O. Box 800

Rosemead,

California 91770

Chairman

Maricopa County Board of Supervisors

301 W. Jefferson, 10th Floor

Phoenix, Arizona 85003

Aubrey V. Godwin, Director

Arizona Radiation Regulatory Agency

4814 South 40 Street

Phoenix, Arizona 85040

'1

if

i

)

1

I

II

(

I

Arizona Public Service Company

Angela K. Krainik, Manager

Nuclear Licensing

Arizona Public Service Company

P.O. Box 52034

Phoenix, Arizona 85072-2034

John C. Horne, Vice President

Power Supply

El Paso Electric Company

2025 N. Third Street, Suite 220

Phoenix, Arizona 85004

Terry Bassham,

Esq.

General Counsel

El Paso Electric Company

123 W. Mills

El Paso, Texas

79901

e

Mr. Robert Burt

Los Angeles Department of Water & Power

Southern California Public Power Authority

111 North Hope Street, Room 1255-B

Los Angeles, California 90051

Mr. David Summers

Public Service Company of New Mexico

414 Silver SW, 01206

Albuquerque, New Mexico 87102

Mr. Brian Katz

Southern California Edison Company

14300 Mesa Road, Drop D41-SONGS

San Clemente, California 92672

Mr. Robert Henry

Salt River Project

6504 East Thomas Road

Scottsdale, Arizona 85251

1

I

I

Arizona Public Service Company

-4-

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard'Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator

DRP Director

Branch Chief (DRP/D)

Senior Project Inspector (DRP/D)

Branch Chief (DRP/TSS)

Resident Inspector

DRS-PSB

MIS System

RIV File

DOCUMENT NAME: R:3 PNPV803RP.JHM

To receive copy of doc ment, Indicate In box: '

= Cop

without enclo

re

"E" = Copy wit

cl

s 'N" = No copy

RIV:RI:

P/D

RI:D

RI:DRP

PE:DRP/

SRI:D

DCarte

NSal

FBrus

DCorpora

y

J Moor

64/23/

C:DRP/D,

PHarrell

05/8/98

OQ 9

054I/98'5

98

OFFICIAL RECORD COPY'

'i

J

Arizona Public Service Company

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bcc to DCD (IE01)

bcc distrib. by, RIV:

Regional Administrator

DRP Director

Branch Chief (DRP/D)

Senior Project Inspector (DRP/D)

Branch Chief (DRP/TSS)

Resident Inspector

DRS-PSB

MIS System

RIV File

DOCUMENT NAME: R:3 PNPV803RP.JHM

To receive copy of doc ment, Indicate in box: '

= Copy without enclo

re

"E" = Copy wit

cl

s 'N" = No copy

RIV:RI:

P/D

DCarte

04/23/

C:DRP/D

PHarrell g9"

05'."//9 8

RI:D

NSalg

054/98

RI:DRP

FBrus

0QV9

PE:DRP/

DCorpora

054U98

'FFICIAL

RECORD COPY

SRI:D

JMoor

05

98

l'