Forwards Insp Repts 50-528/98-12,50-529/98-12 & 50-530/98-12 on 980217-0409.Violations Noted.Team Determined That PVNGS Had Good Corrective Action Program
ML17313A350
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/16/1998
From: Powers D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: James M. Levine
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17313A351 List:
References
50-528-98-12, 50-529-98-12, 50-530-98-12, NUDOCS 9804210122
Download: ML17313A350 (14)


See also: IR 05000528/1998012

Text

CATEGORY 2

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9804210122

DOC.DATE: 98/04/16

NOTARIZED: NO

DOCKET

FACIL:STN-50-528 Palo Verde Nuclear Station,

Unit 1, Arizona Publi

05000528

STN-50-529 Palo Verde Nuclear Station,

Unit 2, Arizona Publi

05000529

STN-50-530'alo

Verde Nuclear Station,

Unit 3, Arizona Publi

05000530

AUTH.NAME

AUTHOR AFFILIATION

POWERS,D.A.

Region

4

(Post

820201)

RECIP

~ NAME

RECIPIENT AFFILIATION

LEVINE,J.M.

Arizona Public Service

Co.

(formerly Arizona Nuclear Power

C

SUBJECT:

Forwards insp repts

50-528/98-12,50-529/98-12

&. 50-530/98-12

on 980217-0409.Violations

noted. Team determined that

PVNGS

had good corrective action program.

T

DISTRIBUTION CODE:

IEOIF

COPIES

RECEIVED:LTR Q ENCL g

SIZE: D 7

(0 3

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

E

NOTES: STANDARDIZED PLANT

Standardized

plant.

Standardized

plant.

05000528

G

05000529

05000530 0

RECIPIENT

ZD CODE/NAME

PD4-2

PD

ZNTERNAL: ACRS

FILE CENTE

NRR DRPM/PECB

NUDOCS-ABSTRACT

OGC/HDS2

EXTERNAL: LZTCO BRYCE,J

H

NRC

PDR

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

FIELDS,M

AEOD/SPD/RAB

DEDRO

NRR/DRCH/HHFB

NRR/DRPM/PERB

OE DIR

RGN4

FILE

01

NOAC

NUDOCS FULLTEXT

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

D

F ~

QOAMD~~0y

NRC FLQPPy

N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.

TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS

OR REDUCE THE NUMBER OF COP

ES RECEIVED BY YOU OR YOUR ORGA iIZAT ON,

CONTACT THE DOCUMENT CONTROL

DESK

tDCD)

ON EXTENSION ill5-2083

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

19

ENCL

19

'i

a '

aaa'a

~ ~

a<

a a

-.

a

aaa

a ~

aO

aaa.a

Ra iaaaa

aiba

a eaa

aa

+ NCaitaaa,~a V Taaa aayayaLq

if

r~

(

t

I

<P,S RICyI

c,+

Wp0

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

April 16, 1998

James

M. Levine, Senior Vice

President, Nuclear

Arizona Public Service Company

P.O. Box 53999

Phoenix, Arizona 85072-3999

SUBJECT: NRC INSPECTION REPORT 50-528/98-12; 50-529/98-12; 50-530/98-12 AND

NOTICE OF VIOLATION

Dear Mr. LeVIne:

From February 17-27, 1998, a corrective action team inspection was conducted at your Palo

Verde Nuclear Generating Station, Units 1, 2, and 3, reactor facilities. Following this inspection,

an exit meeting was held to provide the inspection findings to you and your staff. Further inoffice

inspection was performed from February 29 to April 9, 1998.

Subsequently,

the results of this

inspection were discussed with you, and members of your staff, in a telephonic exit meeting on

April 9, 1998.

Later, on April 9, 1998, your staff telefaxed new information that was related to a

potential violation. That information provided by your staff is attached to the report as

Attachment 2. As a result or our review of this new information, we reconsidered

a potential

violation and determined that no violation occurred.

This finding was provided to your staff by

telephone on April 13, 1998.

The enclosed report presents the scope and results of that

inspection.

The team determined that Palo Verde Nuclear Generating Station had a good corrective action

program.

Conditions that could degrade the quality of plant operations were, for the most part,

being effectively identified, resolved, and prevented.

However, two violations were identified during the inspection.

The first violation concerns two

examples of a failure to followthe requirements of your condition reporting procedure.

We found

that the root cause had not been determined, as required by your procedure, for the failure of a

procedure preparer, reviewer, and management

approver to specify the correct acceptance

criterion for neutron flux power daily channel check surveillance requirements in the issued

procedure.

We also found that a violation of Technical Specifications Surveillance

Requirement 4.0.5, for the performance of ASME inservice inspections of portions of the nuclear

cooling system, had not been documented and, consequently, reviewed in a timely manner as

required by your procedure.

The second violation concerns a failure to perform transportability

reviews of adverse conditions, as required by procedures for 27 instrument air system free air

regulator failures.

98042i0122 9804ib

PDR

.ADOCK 05000528

8

PDR

ri

l

Arizona Public Service Company

-2-

The violations are cited in the enclosed Notice of Violation (Notice) and the circumstances

surrounding the violations are described in detail in the enclosed report.

Please note that you

are required to respond to this letter and should follow the instructions specified in the enclosed

Notice when preparing your response.

The NRC will use your response,

in part, to determine

whether further enforcement action is necessary

to ensure compliance with regulatory

requirements.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its

enclosures,

and your response will be placed in the NRC Public Document Room (PDR).

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

Dr. Dale A. Powers, Chief

Maintenance Branch

Division of Reactor Safety

Docket Nos.: 50-528; 50-529; 50-530

License Nos.: NPF-41; NPF-51; NPF-74

Enclosures:

1.

Notice of Violation

2.

NRC Inspection Report

50-528/98-12; 50-529/98-12; 50-530/98-12

cc w/enclosures:

Mr. Steve Olea

Arizona Corporation Commission

1200 W. Washington Street

Phoenix, Arizona 85007

Douglas K. Porter, Senior Counsel

Southern California Edison Company

Law Department, Generation Resources

P.O. Box 800

Rosemead,

California 91770

.r <

)r

l

,l

Arizona Public Service Company

Chairman

Maricopa County Board of Supervisors

301 W. Jefferson, 10th Floor

Phoenix. Arizona 85003

Aubrey V. Godwin, Director

Arizona Radiation Regulatory Agency

4814 South 40 Street

Phoenix, Arizona 85040

Angela K. Krainik, Manager

Nuclear Licensing

Arizona Public Service Company

P.O. Box 52034

Phoenix, Arizona 85072-2034

John C. Horne, Vice President

Power Supply

El Paso Electric Company

2025 N. Third Street, Suite 220

Phoenix, Arizona 85004

Terry Bassham,

Esq.

General Counsel

EI Paso Electric Company

123 W. Mills

El Paso. Texas

79901

Mr. Robert Burt

Los Angeles Department of Water & Power

Southern California Public Power Authority

111 North Hope Street, Room 1255-B

Los Angeles, California 90051

Mr. David Summers

Public Service Compan'y of New Mexico

414 Silver SW, /f1206

Albuquerque, New Mexico 87102

Mr. Brian Katz

Southern California Edison Company

14300 Mesa Road. Drop D41-SONGS

San Clemente, California 92672

Il

+ c'

1

1

I

f

Arizona Public Service Company

Mr. Robert Henry

Salt River Project

6504 East Thomas Road

Scottsdale. Arizona 85251

s

I

(

l

Arizona Public Service Company

-4-

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator

DRP Director

Branch Chief (DRP/F, WCFO)

Senior Project Inspector (DRP/F, WCFO)

Branch Chief (DRP/TSS)

WCFO File

Resident Inspector

DRS-PSB

MIS System

RIV File

DOCUMENT NAME: R:7 PNPV8

RP.WPA

To receive copy of d cument, Indicate In

x: "C" = Cop

without enclosures

"E" = Cop

with enclosures "N" = No cop

SRI:MB:RIV,

SRI:MB

SRI:MB

Rl:MB

C:PBF

C:MB

E

WPAn

~=

CJP

i

RLNease ~ WMMc

'll DKirsch Pf'<

DAPower

04/i+9

OFFICIAL RECORD COPY

04/I

9

<<04

/9 '4

98

r498 ~

04//g98

Arizona Public Service Company

-4-

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator

DRP Director

Branch Chief (DRP/F, WCFO)

Senior Project Inspector (DRP/F. WCFO)

Branch Chief (DRP/TSS)

WCFO File

Resident Inspector

DRS-PSB

MIS System

RIV File

DOCUMENT NAME':t PNPV8

RP.WPA

To receive copy of d cuinent. indicate in

x: "c" = copy without enclosures

"E" = copy with enclosures "N" = No copy

SRI:MB:RIV

SRI:MB

SRI:MB

Rl:MB

C:PBF

C:MB

WPAng

04/i

98

CJP

04 V/9

RLNease ~M WMMc

tll

04/I998~

04/

98

OFFICIAL RECORD COPY

%98~

04//g98

DKirsch t <<

DAPower

a