ACCESSION NBR:9801020170 DOC.DATE: 97/12/17 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50,-529,Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION LEVINE,J.M.
Arizona Public Service Co.
(formerly Arizona Nuclear Power RECIP.NAME
'ECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Informs of no adverse impact on operator training due to delay of implementing pressurizer safety valve setpoint changes in simulators from 971025 to 971231.
DISTRIBUTION CODE:
R005D COPIES RECEIVED:LTR l ENCL Q SIZE:
TITLE: Simulator Facility Certification - GL-90-08 A
T E
NOTES: STANDARDIZED PLANT Standardized plant.
Standardized plant.
05000528 G 05000529.
05000530()
RECIPIENT ID CODE/NAME CLIFFORD,J INTERNA : FILE C NTE 01 EXTERNAL: NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME NRR/DRCH/HOLB COPIES LTTR ENCL D
E NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPXES REQUIRED:
LTTR I
4 ENCL
e I
l 1
Palo Verde Nuclear Generating Station James M. Levine Senior Vice President Nuclear TEL (602)3934300 FAX(602)3934077 Mail Station 7602 P.O. Box 52034 Phoenix, AZ85072-2034 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001 102-04054 JML/AKK/GAM December 17, 1997
References:
1.
Letter No. 102-03578-WLS/AKK/GAM, dated January 5, 1996, from William L. Stewart, APS, to NRC, "Proposed Amendments to Facility Operating Licenses and to Technical Specifications and Various Bases, Related to Power Uprate."
Letter dated May 23, 1996, from Charles R. Thomas, NRC to William L. Stewart, APS, Issuance ofAmendments for the Palo Verde Nuclear Generating Station Unit No. 1, Unit No. 2, and Unit No. 3."
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2 and 3 Docket Nos. STN 50-628/629/530 Missed Simulator Commitment In Reference 1, APS submitted a license amendment request to implement power uprate at PVNGS and committed to implement the power uprate modifications in the simulators within a year of the uprate being implemented in Unit 1. The simulator modifications would consist of changes to the core operating limit supervisory system (COLSS) addressable constants, primary safety valve setpoint, and nuclear instrument indication. The NRC approved the power uprate amendment request and documented this commitment in Reference 2, the NRC Safety Evaluation for amendments numbers 108, 100, and 80 for PVNGS Units 1, 2, and 3, respectively.
The power uprate amendment was implemented in Unit 1 on October 25, 1996, and, therefore, the due date for the related simulator modifications was October 25, 1997.
The pressurizer safety valve s'etpoint changes from 2500 to 2475 psia associated with the power uprate amendment, however, were not incorporated in the simulator before October 25, 1997 as committed.
The changes to the COLSS addressable constants and nuclear instrument indication associated with power uprate were incorporated in the simulators prior to October 25, 1997. The pressurizer safety valve setpoint changes associated with the power uprate amendment will be implemented in the simulators by December 31, 1997.
'980i020i70 97i2i7V PDR
'ADGCK 05000528 P
PORE.
'~ IIIIIIIIIIIIIIIIIIIII IIII IIII,IIIIIII
~ ~
'U. S. Nuclear Regulatory Commission ATT. Document Control Desk Missed Simulator Commitment Page 2 The simulator training scenarios scheduled between October 25, 1997 and December 31, 1997, were reviewed to identify any potential impact of the delay to incorporate the pressurizer safety valve setpoint changes.
None of the licensed operator continuing training scenarios challenged the pressurizer safety valves or contained tasks for the safety valves.
Therefore, there is no adverse impact on operator training due to the delay of implementing the pressurizer safety valve setpoint changes in the simulators from October 25, 1997 to December 31, 1997.
This failure to comply with the commitment to the NRC is being addressed in the PVNGS corrective action program.
Should you have any questions, please contact Scott A. Bauer at (602) 393-5978.
Sincerely, JML/AKK/GAM/rlh cc:
E. W. Merschoff K. E. Perkins J. W. Clifford J. H. Moorman