DOCKET I 05000528 05000529 05000530
SUBJECT:
Provides status of PVNGS activities associated w/resolution of GL 92-08, "Thermo-Lag 330-1 Fire Barriers."
DISTRIBUTION CODE:
A029D COPIES RECEIVED:LTR ENCL'IZE-TITLE: Generic Letter 92-008 Thermo-Lag 330 Fire Barrier CATEGORY 1 REGULAT INFORMATION DISTRIBUTION xSTEM (RIDS)
I I
0 ACCESSION NBR:9710010336 DOC.DATE: 97/09/26 NOTARIZED: NO FACIL:$'ZN 50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi AUTH.NAME AUTHOR AFFILIATION IDE,W.E.
Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
NOTES:STANDARDIZED PLANT Standardized plant.
Standardized plant.
05000528 05000529 05000530 G
RECIPIENT ID CODE/NAME PD4-2 LA THOMAS,K INTERN~
ZfE CENTER 0
PD3-1 RGN4 FILE COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD4-2 PD NRR/DE/EELB NRR/DSSA/SPLB COPIES LTTR ENCL EXTERNAL: NOAC NRC PDR D
U E
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATIONREMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 10 ENCL
0 I
es
~
~
-1L t
l l)t Jl I
jl l
I s
Commttnmnt. Innotrntton. Energy.
Palo Verde Nuclear Generating Station William E. Ide Vice President Nuclear Engineering TEL 602/3934116 FAX 602/3936077 Mail Station 7605 P.O. Box 52034 Phoenix, AZ65072-2034 102-04021-WEI/SAB/RMW September 26, 1997 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001
References:
1 Letter 102-03833-JML/SAB/NLT, dated December 31, 1996, from J. M. Levine, Senior Vice President, Nuclear, APS to USNRC
.Letter 102-03946-WEI/SAB/RMW, dated May 30, 1997, from W. E. Ide, Vice President, Nuclear Engineering, APS to USNRC
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Status of PVNGS Activities Associated with the Resolution of Generic Letter 92-08, "Thermo-Lag 330-1 Fire Barriers".
Arizona Public Service Company (APS) has been actively pursuing completion of the activities described in References 1 and 2 associated with the resolution of Generic Letter 92-08, "Thermo-Lag 330-1 Fire Barriers". The purpose of this letter is to provide you with a status of the work being performed to upgrade the Thermo-Lag 330-1 barriers that will be credited in the Fire Hazard Analysis.
This work is now essentially 99% complete.
APS has identified one section of conduit in Unit 1 that can not be upgraded in it's current configuration due to interferences with steam trap piping and a pipe support that is in very close proximity to the conduit that is to be protected.
APS had completed the field 'work for the Thermo-Lag upgrade on the subject section during August 1997.
An engineering field walkdown to verify the installation of the Thermo-Lag upgrade identified that the new Thermo-Lag envelope was degraded due to the close proximity of the steam trap piping. The Thermo-i ag section was removed from the conduit. Appropriate fire protection compensatory actions are in place and will remain in place until the Thermo-Lag envelope is re-installed.
97i0010336 970926 PDR ADQCK 05000528 P.
PDR IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII'
n 7:
t
~
4 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Page 2 APS is currently performing an engineering evaluation to determine the most appropriate method for resolving this issue.
The conduit or piping and pipe support may be relocated such that the interference is removed to allow correct installation of the upgraded Thermo-Lag section on the conduit.
APS expects that the engineering, plant modifications and upgraded Thermo-Lag section re-installation will be completed by December 31, 1997.
Please contact Mr. Scott Bauer at (602) 393-5978 if you have any questions or comments.
Sincerely, WEI/SAB/RMW/rlh cc:
E. W. Merschoff K. M. Thomas J. H. Moorman K. E. Perkins