Forwards Public Notice of Application for Amend to Operate License
ML17312B658
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 09/02/1997
From: Thomas K
NRC (Affiliation Not Assigned)
To: James M. Levine
ARIZONA POWER AUTHORITY
References
NUDOCS 9709120291
Download: ML17312B658 (14)


Text

September 2,

1997 Mr. James H. Levine Executive Vice President, Nuclear Arizona Public Service Company Post Office Box 53999

Phoenix, Arizona 85072-3999

SUBJECT:

PUBLIC NOTICE OF APPLICATION FOR AMENDMENT TO OPERATING LICENSE FOR PALO VERDE NUCLEAR GENERATING STATION UNIT 2

Dear Mr. Levine:

The enclosed public announcement was forwarded to the Arizona Republic for publication.

This announcement relates to your application dated August 28, 1997, for an amendment to Facility Operating License No.

NPF-51 for the Palo Verde Nuclear Generating Station Unit 2.

A separate notice will be published later in the Federal Receister concerning the license amendment.

Sincerely, Original Signed By Kristine H. Thomas, Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation

Enclosure:

Public Announcement DISTRIBUTION:

".Docket PUBLIC PDIV-2 Reading cc w/encl:

See next page EAdensam (EGAl)

WBateman KThomas EPeyton ACRS OGC OPA HLesar

PGwynn, Region IV
KPerkins, Region IV WCFO
HHammond, Region IV WCFO BHenderson, Region IV
  • For previous concurrences see attached ORC Document Name:

PV.EXI OFC PDI V-2 omas PDIV-2 E yo PDIV-2*

WBateman DATE 9/0,/97 AL 9709i2029i 970902 PDR ADQCK 05000529

,P PDR 9/cot297 8/29/97 i IIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIII IRC IHH CMlI'E CIII'V

II Il t

I' L

Mr. James M. Levine September 2,

1997 cc w/encl:

Mr. Steve Olea Arizona Corporation Commission 1200 W. Washington Street

Phoenix, Arizona 85007 Douglas Kent Porter Senior Counsel Southern California Edison Company Law Department, Generation Resources P.O.

Box 800

Rosemead, Cali fornia 91770 Senior Resident Inspector USNRC P. 0.

Box 40

Buckeye, Arizona 85326 Regional Administr ator, Region IV U.

S. Nuclear Regulatory Commission Harris Tower 5 Pavillion 611 Ryan Plaza Drive. Suite 400 Arlington'exas 76011-8064 Chairman.

Board of Supervisors ATTN:

Chairman 301 W. Jefferson.

10th Floor

Phoenix, Arizona 85003 Mr. Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 South 40 Street
Phoenix, Arizona 85040 Ms. Angela K. Krainik, Manager Nuclear Licensing Arizona Public Service Company P.O.

Box 52034

Phoenix, Arizona 85072-2034 Mr. John C. Horne.

Vice President Power Supply Palo Verde Services 2025 N. Third Street, Suite 220 Phoenix.

Arizona 85004 Mr. David Summers Public Service Company of New Mexico 414 Silver SW, f0604 Albuquerque, New Mexico 87102 Mr. Robert D. Bledsoe Southern California Edison Company 14300 Mesa

Road, Drop D41-SONGS San Clemente, California 92672 Mr. Robert Henry Salt River, Project 6504 East Thomas Road Scottsdale, Arizona 85251 Terry Bassham, Esq.

General Counsel El Paso Electric Company 123 W. Mills El Paso, Texas 79901 Mr. Robert Burt Los Angeles Department of Water 8

Power Southern California Public Power Authority 111 North Hope Street, Room 1255-B Los Angeles, California 90051

PUBLIC NOTICE NRC STAFF PROPOSED TO AMEND THE OPERATING LICENSE FOR PALO VERDE. UNIT NO.

2 The U.S. Nuclear Regulatory Commission (NRC) has received an application dated August 28,

1997, from the Arizona Public Service Company (APS or the licensee) for an amendment to Facility Operating License No.

NPF-51 for Palo Verde, Unit 2.

(PVNGS) located in Maricopa County. Arizona.

The proposed amendment would increase the surveillance interval on a

one-time basis for the engineered safety features actuation

system, main steam isolation signal instrumentation Surveillance Requirement 4.3.2. 1.

Specifically. the quarterly CHANNEL FUNCTIONAI TEST requirements of Table 4.3-2, "Engineered Safety Features Actuation System Instrumentation Surveillance Requirements'

" items 1,

2 and 3 of IV.B, "ESFA System Logic," and IV.C, "Automatic Actuation Logic," would be extended for five days beyond the 25 percent extension of the surveillance interval allowed by TS 4.0.2.

The following is a discussion of the exigent circumstances for the amendment:

APS is requesting an amendment to PVNGS

~<< << 2 Technical Specifications (TS) to extend the quarterly surveillance interval by five days beyond the 25 percent extension allowed by TS 4.0.2 for the channel functional test for the main steam isolation signal (MSIS) engineered safety features actuation system (ESFAS) logic consisting of matrix logic, initiation logic. automatic actuation logic and manual MSIS as listed in Table 4.3-2.

The surveillance tests cannot be performed because there is a degraded contact block on the control room manual MSIS switch for Channel C which could cause a spurious trip input to the MSIS initiation logic.

Spurious actuation of this switch during the performance of the quarterly MSIS channel functional tests may cause an inadvertent MSIS signal and result, in tripping the unit.

The quarterly survei llances are due September 4

~ 1997. which includes the maximum extension of 25 percent allowed by TS 4.0.2.

A five day surveillance extension would allow the Unit to begin a controlled shut down for the scheduled refueling outage on September 6.

1997.

and proceed to Mode 5 by September 9,

1997, where the surveillance is not required.

The switch will be replaced after the Unit enters Mode 5 and tested prior to Unit startup.

Although APS has replaced these switches on-line before, this evolution

is considered high risk due to the physical location of the switch and the close proximity to other ESFAS channels and reactor protection system channels.

APS has determined that the risk associated with switch replacement outweighs the risk associated with increasing the allowed surveillance interval by five, days.

The exigent situation exists and cannot be avoided because (1) the degraded condition of the MSIS manual switch did not occur until August 14, 1997.

and could not have been predicted, (2) performance of the ESFAS logic channel functional tests with the degraded switch could cause an inadvertent MSIS (and a resulting plant trip), and (3) the quarterly surveillance requirements cannot be extended beyond September 4,

1997, without exceeding TSs 3.3.2 and 4.0.2 periodicity requirements which would requi re entering TS 3.0.3 Action Statements to shut down the Unit.

The staff finds the licensee acted in a timely manner and there was not sufficient time to process this amendment request in the routine manner as described in 10 CFR 50.91 without causing an unnecessary shutdown.

The licensee's analysis of the no significant hazards consideration is presented below:

1.

The proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.

r The proposed Technical Specification (TS) amendment would increase the surveillance interval on a one-time basis for the ESFAS MSIS instrumentation surveillance requirement of TS 4.3.2.1.

Specifically, the quarterly CHANNEL FUNCTIONAL TEST requi rements of Table 4.3-2, "Engineered Safety Features Actuation System Instrumentation Surveillance Requirements"

~ items 1, 2 and 3 of IV.B. "ESFA System Logic"

~

and IV.CD "Automatic'ctuation Logic".

would be extended for five days beyond the 25 percent extension of the surveillance interval allowed by TS 4.0.2.

Increasing the surveillance interval does not constitute a physical change to the Unit or make changes in the setpoints

~ system logic or manual actuation'.

In addition. this change does not alter physical plant equipment or the way in which plant equipment is operated.

Therefore. it does not involve a significant increase in the probability or consequences of an accident previously evaluated.

The ESFAS is designed such that a single failure in the system will not prevent actuation of the system if required to do so.

The manual initiation logic is designed in a selective two-out-of-four arrangement.

Either Channel A or C will actuate leg 1-3 of the initiation logic.

Either Channel B or D will actuate leg 2-4 of the initiation logic.

When both legs have been actuated, then the appropriate signal will be generated, a MSIS in this case.

The Channel C manual MSIS handswitch is still capable of performing its intended function

- actuating MSIS leg 1-3 initiation logic.

Therefore, the system may sustain a single failure and still be capable of performing its intended safety function of mitigating

certain design basis events.

Since the system actuation capability has not been changed by the requested surveillance interval extension, the proposed TS amendment does not involve a significant increase in the probability or consequences of an accident previously evaluated.

2.

The proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.

The proposed TS amendment would increase the surveillance interval on a one-time basis for the ESFAS MSIS instrumentation surveillance requirement of 4.3.2.1.

Specifically, the quarterly CHANNEL FUNCTIONAL TEST requirements of Table 4.3-2.

"Engineered Safety Features Actuation System Instrumentation Surveillance Requirements",

items 1,

2 and 3 of IV.B. "ESFA System Logic", and IV.C. "Aut~~atic Actuation Logic", would be extended for five days beyond the 25 percent extension of the surveillance interval allowed by TS 4.0.2.

The proposed one-time surveillance interval extension does not introduce any new modes of plant operation or new accident precursors.

No physical alterations to plant configurations or changes to system setpoints or logic are proposed by this request.

The proposed TS amendment is requesting a one-time extension of the quarterly surveillance interval for the MSIS system logic and does not represent any activity which could initiate a new or different kind of accident.

No new fai lure modes have been defined.

nor any new system interactions introduced, for any plant system or component.

In addition,. no new limiting fai lure has been identified as a result of the proposed change.

The ESFAS MSIS system logic remains the same and is capable of performing its design function.

Therefore, the proposed TS amendment does not create the possibility of a new or different kind of accident from any accident previously evaluated.

3.

The proposed change does not involve a significant reduction in a margin of safety.

The proposed TS amendment would increase the surveillance interval on a one-time basis for the ESFAS MSIS instrumentation surveillance requirement of 4.3.2. 1.

Specifically, the quarter ly CHANNEL FUNCTIONAL TEST requirements of Table 4.3-2

~ "Engineered Safety Feature Actuation System Instrumentation Surveillance Requirements",

items 1,

2 and 3 of IV.B, "ESFA System Logic", and IV.C. "Automatic Actuation Logic"

~ would be extended for five days beyond the 25 percent extension of the surveillance interval allowed by TS 4.0.2.

Under the proposed TS amendment, the ESFAS MSIS instrumentation, including the manual trip switches'emain capable of performing their safety functions.

The proposed TS amendment does not affect the design or performance of the ESFAS.MSIS logic.

As such, the response of the MSIS actuation instrumentation would not change and.

therefore, there would be no change in analyzed accident scenarios

I

0 and/or outcomes.

Therefore, the proposed change does not involve a significant reduction in a margin of safety.

Following an initial review of this application against the standards in 10 CFR 50.92. the NRC staff has made a proposed (preliminary) determination that the amendment request involves no significant hazards consideration.

According to 10 CFR 50.92(c). this means that the proposed amendment would not involve a significant increase in the probability or consequences of an accident previously evaluated, would not create the possibility of a new or different kind of accident from any accident previously evaluated, or involve a significant reduction in a margin of safety.

If the proposed determination that the requested license amendment involves no significant hazards consideration becomes final, the NRC staff will issue the amendment without first offering an opportunity for a public hearing.

An opportunity for hearing will be published in the Federal Re ister at a later date and any hearing request will not delay the effective date of the amendment.

If the NRC staff decides in its final determination that the amendment does involve a significant hazards consideration, a notice of opportunity for a prior hearing will be published in the Federal Re ister and. if a hearing is granted, it will be held before the amendments are issued.

Comments on the proposed determination of no significant hazards consideration may be submitted to William Bateman

~ Director, Project Directorate IV-2, by collect call to 1-301-415-1371 or by facsimile to 1-301-415-3061.

Written comments may be submitted by mail to the Chief. Rules Review and Directives Branch, Division of Freedom and Information and Publications Services, Office of Administration, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001.

Written comments may also be delivered to Room 6D22, Two White Flint North.

11545 Rockville Pike. Rockville,

~ V'

maryland, from 7:30 a.m. to 4:15 p.m.

Federal workdays.

Copies of written

'omments received may be examined at the NRC Public Document Room, the Gelman Building. 2120 L Street.

NW., Washington, OC.

All comments received by 4: 15 p.m. Eastern Daylight Savings Time on September 3.

1997, will be considered in reaching a determination.