Forwards Studies in Partial Response to NRC First & Second RAIs Re risk-informed IST Pilot Program
ML17312B613
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/31/1997
From: Ide W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17312B614 List:
References
102-03986-WEI-A, 102-3986-WEI-A, NUDOCS 9708080063
Download: ML17312B613 (8)


Text

CATEGORY,1 REGULATC'O INFORMATION DISTRIBUTION'STER (RIDE)

ACCESSION NBR: 9708080063 DOC. DATE: 97/07/31 NOTAR ZED: NO 'OCKE Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Statio i,,Unit 2, Arizona Publi '5000529

'ACIAL:STN-50-528 STN-50-530 Palo Verde Nuclear. Station, Unit 3, Arizona Publi ,05000530 AUTH. NAME AUTHOR AFFILIATION Arizona Public Service Co. (formerly Arizona Nuclear -Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk).

SUBJECT:

Forwards studies in partial response to NRC first a'econd RA(s re risk-informed IST pilot program.

DISTRIBUTION CODE: A047D TI.LE: OR COPIES RECEIVED:LTR Submittal: Inservice/Testing/Relief from

( ENCI J ASME Code SIZE:

GL-89.-04 NOTES:STANDARDIZED PLANT ,05000528 Standardized plant. 05000529 0

Standardized plant. 05000530 0

RECIPIENT COPIES RECIPIENT COPIES R

ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 LA 1 1 PD4-2'D 1 "1 THOMASFK 1 1 INTERNAL: ACRS 1 1 AEOD/SPD/RAB 1 '

1 1 NRR/DE/EMEB 1 1 RES/DET/EIB 1

1 1

1 OGC/HDS2 RES/DET/EMMEB 1

1 '1 0 D

EXTERNAL: LITCO ANDERSON 1 1 NOAC 1 1',

NRC PDR 1 1 0

U M

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EX'15-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED)

TOTAL NUMBER OF COPIES REQUIRED: LTTR 14,'ENCL','"1"3;" ";;'"<<:.:;."

r I

I r

c

'I j

'-u>l Comm//moor./nnmmrlon, Eiwyy.

William E. Ide Mail Station 7605 Palo Verde Nuclear Vice President TEL 602/393-6116 P.O. Box 52034 Generating Station Nuclear Engineering FAX 602/3934077 Phoenix, AZ 85072-2034 102-03986 - WEI/AKK/RKB July 31, 1997 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001

References:

1 Letter No. 102-03554, dated November 27, 1995, from W. L. Stewart, APS to USNRC.

2. Letter No. 102-03573, dated December 20, 1995, from W. L. Stewart, APS to USNRC.
3. Letter dated March 15, 1996, from C. R. Thomas, USNRC to W. L. Stewart, APS.
4. Letter No. 102-03714, dated June 7, 1996, from J. A. Bailey, APS to USNRC.
5. Letter No. 102-03752, dated August 7, 1996, from W. L. Stewart, APS to USNRC.

Letter No. 102-03763, dated August 23, 1996, from A. K. Krainik, APS to USNRC.

Letter dated March 21, 1997, from J. W. Clifford, USNRC, to W. L. Stewart, APS.

Letter dated June 9, 1997, from J. W. Clifford, USNRC, to J. M. Levine, APS.

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1,2, and 3 Docket Nos. STN 50-528/529/530 Engineering Studies Related to the Risk-Informed lnservice Testing Pilot Program.

IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 97080800bS 97078i PDR ADQCK 05000528 P PDR

U.S. Nuclear Regulatory ommission ATTN: Document Control Desk Engineering Studies Related to Risk-Informed Inservice Testing Pilot Program Page 2 Arizona Public Service Company (APS) submitted a request (references 1 and 2) to the United States Nuclear Regulatory Commission (NRC) as part of a pilot plant effort related to risk-informed inservice testing (Rl-IST). In reference 3, the NRC staff provided an initial request for additional information (RAI) to APS related to the Rl-IST pilot program. A partial response to the initial RAI was provided by APS to the NRC staff via reference 4. In reference 5, APS committed to provide the NRC staff with a revised schedule for fully responding to the initial RAI by September 15, 1996. APS submitted additional information to the NRC staff related to the initial RAI in reference 6.

A second RAI was provided to APS by the NRC staff via reference 7. In reference 8, the NRC staff provided APS with a third RAI related to draft regulatory guides and standard review plan sections released for public comment in support of risk-informed regulation and RI-IST.

In a continuing effort to support the Rl-IST pilot program, APS recently completed several engineering studies. The enclosed documents have been developed to provide repeatable, scrutable, and documentable input to the integrated decision making process where quantitative risk information is not available. APS has not yet completed the establishment of the integrated risk-informed process itself, and the enclosed studies may be revised prior to use in that process. However, the studies are representative of the approach APS would use in providing information to be evaluated by the expert panel.

The enclosed studies are being provided to the NRC staff in partial response to the first and second RAI's (references 3 and 7). Enclosure 1 is an engineering study (13-NS-C17) entitled "Analysis of Risk Based IST- Shutdown Modes." Enclosure 2 is a study entitled "Valve Importance Sensitivity for External Events (Fire) for Risk-Based Inservice Testing," (1 3-NS-C27). Enclosure 3 (13-NS-C28) is a study entitled "Seismic Risk Ranking to Support IS T Risk Ranking Process."

APS requests that NRC fees not be assessed for this and other requests/reports associated with the Rl-IST pilot program, based on the provisions of 10 CFR 171.21, footnote 4, item 3. This footnote to the Schedule of Facility Fees states that "Fees will not be assessed for requests/reports submitted to the NRC ..... as a means of exchanging information between organizations and the NRC for the purpose of supporting generic regulatory improvements or efforts." The RI-IST pilot program is an industry initiative (with PVNGS and Commanche Peak as lead pilot plants) with the purpose of supporting generic regulatory improvements in Inservice Testing requirements.

'U.S. Nuclear Regulatory ommission ATTN: Document Control Desk Engineering Studies Related to Risk-Informed Inservice Testing Pilot Program Page 3 Should you have any questions, please contact Scott A. Bauer at (602) 393-5978.

Sincerely, WEI/AKK/RKB/mah Enclosure(s) cc: E. W. Merschoff K. E. Perkins K. M. Thomas F. L. Brush D. C. Fischer