Provides 120 Day Response to GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations
ML17312B593
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/30/1997
From: Ide W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
102-03981-JML-A, 102-3981-JML-A, GL-97-01, GL-97-1, NUDOCS 9708050192
Download: ML17312B593 (6)


Text

CATEGORY 1 REGULATOO INFORMATION DISTRIBUTION 03TEM (RIDE) i'CCESSION NBR:9708050192 DOC.DATE: 97/07/30 NOTARIZED: YES

"'OCKET FACIL:STN-50;528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 S'l'N-5Y 529 Palo Verde Nuclear Station, Unit 2, Arizona Publi, 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION IDE,W.E.

Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Provides 120 day response to GL 97-01, "Degradation of Control Rod Drive Mechanism Nozzle a Other Vessel Closure Head Penetrations."

T DISTRIBUTION CODE:

A075D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: GL-97-01 Degraduation of Control Rod Drive Mechanism

& Other Vessel NOTES:STANDARDIZED PLANT 05000528 g

Standardized plant.

05000529 Standardized plant.

,05000530 RECIPIENT ID CODE/NAME PD4-2 LA PDl-1/HAROLD,J INTERNA FILE ENTE MNEB EXTERNAL: NRC PDR COPIES LTTR ENCL 1

1 1

0 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD4-2 PD THOMAS,K NRR/DE/EMCB RGNTg COPIES LTTR ENCL 1

1 1

1' 3

1 1

R D

0 N

NOTE TO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EKT. 415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED:

LTTR 11 ENCL 10

'y Commitment Innoratlaa &eyy.

\\

Paio Verde Nuclear Generating Station James M. Levine Senior Vice President Nuclear TEL (602)393-5300 fAX(602)3934077 Mail Station 7602 P.O. Box 52034 Phoenix, AZ 65072-2034 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001

Dear Sirs:

102-03981 - JML/AKK/JRP July 30 1997

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Response to NRC Generic Letter 97-01 This letter provides Arizona Public Service Company's (APS) 120 day response to NRC Generic Letter 97-01, "Degradation of Control Rod Drive Mechanism Nozzle and Other Vessel Closure Head Penetrations".

APS, in association with industry groups and the Combustion Engineering Owners Group (GEOG), has reviewed the information-presented in the Generic Letter.

The CEOG has prepared report CE NPSD - 1085 on behalf of it's members providing a complete and detailed response to the information requested by the Generic Letter.

The GEOG report was submitted to the NRC by letter GEOG-97-244 dated July 25, 1997.

APS endorses CE NPSD-1085, Rev.0 dated July 1997, which contains the information requested by the Generic Letter as it pertains to PVNGS.,APS supports the GEOG integrated inspection program as described in the report and expects inspection data from this program to confirm that primary water stress corrosion cracking (PWSCC) of Alloy 600 reactor vessel head (RVH) nozzles does not represent a nuclear plant safety issue.

APS also supports the NEI sponsored industry action to further develop a U.S. PWR integrated inspection program to address RVH penetration PWSCC concerns and develop appropriate analyses to support a sample inspection plan.

9'708050%92 970730 P

~75

/

p t

U. S. Nuclear Regula ory Commission

'T&I:Document Control Desk Mail Station P1-37

'Washington, DC 20555-0001 Pager In addition to limited GEOG plant inspections already performed, two additional GEOG plants with RVH Alloy 600 nozzles considered to have high susceptibility to PWSCC have made plans to inspect penetrations in Summer, 1997 and Spring, 1999.

It is expected that these plant inspection data will further confirm the GEOG's RVH penetration cracking susceptibility modeling and support future inspection planning.

Should you have any questions, please call Scott A. Bauer at (602) 393-5978.

Sincerely, JML/AKK/JRP/mah cc:

E. W. Merschoff K. M. Thomas K. E. Perkins F.

L. Brush D. F. Pilmer (GEOG)

STATE OF ARIZONA

)

) ss.

COUNTY OF MARICOPA

)

I, W. E. Ide, represent that I am Vice President Nuclear Engineering, Arizona Public Service Company (APS), that the foregoing document has been signed by me on behalf of APS with full authority to do so, and that to the best of my knowledge and belief, the statements made therein are true and correct.