ML17312B534
| ML17312B534 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 06/24/1997 |
| From: | Howell A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | James M. Levine ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| Shared Package | |
| ML17312B535 | List: |
| References | |
| 50-528-97-13, 50-529-97-13, 50-530-97-13, NUDOCS 9707010055 | |
| Download: ML17312B534 (12) | |
See also: IR 05000528/1997013
Text
CATEGORY 2
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
CCESSION NBR:9707010055
DOC.DATE: 97/06/24
NOTARIZED: NO
DOCKET
FACIL:STN-50-528 Palo Verde Nuclear Station,
Unit 1, Arizona Publi
05000528
STN-50-529
Palo Verde Nuclear Station,
Unit 2, Arizona Publi
05000529
STN-50-530
Palo Verde Nuclear Station, Unit 3, Arizona Publi
05000530
AUTH.NAME
AUTHOR AFFIIIATION
HONELL,A.T.
Region
4 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
LEVINE,J.M.
Arizona Public Service
Co. (formerly Arizona Nuclear
Power
SUBJECT:
Forwards
insp repts
50-528/97-13,50-529/97-13
& 50-530/97-13
on 970513-16
& 0620
& notice of violation. Violation re
failure to meet procedural
requirements
concerning
initiation
& disposition of measuring
& test equipment.
DISTRIBUTION CODE:
IE01F
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:STANDARDIZED PLANT
Standardized
plant.
Standardized
plant.
05000528
G
05000529
05000530
0
RECIPIENT
ID CODE/NAME
PD4-2
INTERNAL: ACRS
Tg
Q LE~"hIZZ
NRR/DRCH/HHFB
NRR/DRPM/PERB
OE DIR
RGN4
FILE
01
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
THOMASiK
AEOD/SPD/RAB
DEDRO
NRR/DISP/PIPB
NRR/DRPM/PECB
NUDOCS-ABSTRACT
OGC/HDS2
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
D
EXTERNAL: LITCO BRYCE,J
H
NRC
1
1
1
1
NOAC
NUDOCS FULLTEXT
1
1
1
.
1
U
N
LOADED FRGM
, NRC FLOPPY
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS
OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL
DESK
(DCD)
ON EXTENSION 415-2083
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
20
ENCL
20
i
lI
1'tgy(
~o
Cy
I
+a*<<"
UN IT E0 STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZA DRIVE, SUITE 400
ARLINGTON,TEXAS 76011 8064
June 24, 1997
James
M. Levine, Senior Vice
President,
Nuclear
Arizona Public Service Company
P.O. Box 53999
Phoenix, Arizona 85072-3999
SUBJECT:
NRC INSPECTION REPORT 50-528/97-13; 50-529/97-13; 50-530/97-13 AND
Dear Mr. Levine:
An NRC inspection was conducted
May 13-16, 1997, at your Palo Verde Nuclear
Generating Station, Units 1, 2, and 3, reactor facilities. Following additional inoffice
inspection,
a supplemental
telephonic exit was held on June 20, 1997.
The enclosed
report presents the scope and results of that inspection.
This inspection reviewed your program for control of measuring
and test equipment, and
the planned and implemented corrective actions to address
the findings of your recent
audit of this program.
Our inspector identified a violation of NRC requirements.
The violation concerned the
failure to meet procedural requirements
related to the initiation and disposition of
measuring and test equipment out-of-tolerance notices.
Our concern that resulted from
this inspection finding was that the use of out-of-tolerance
or potentially out-of-tolerance
measuring
and test equipment could have resulted in a failure to identify degrading
performance of structures, systems, or components
that are safety-related
or important to
safety.
This violation is cited in the enclosed Notice of Violation (Notice) and the circumstances
surrounding the violation is described
in detail in the enclosed report.
The Nuclear
Assurance Audit of your Measuring and Test Equipment Program dated December 24,
1996, has addressed
the violation and provided the corrective actions you plan to address
the root causes.
Therefore, you are not required to respond to this letter.
However, you
are required to submit a written statement
or explanation pursuant to 10 CFR 2.201 if the
description therein does not accurately reflect your corrective actions or your position.
In
that case, or if you choose to respond; please follow the items in the enclosed Notice
when preparing your reply.
We will perform a followup inspection in the future to evaluate
the effectiveness of the corrective action.
97070i0055
970624
ADOCK 05000528
8
IIIJJJJIJJJJIJJJJJJJJJJIJJJJJJJJJJJJIIII
Arizona Public Service Company
-2-
ln accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of this letter,
its enclosures,
and your response
will be placed in the NRC Public Document Room (PDR).
To the extent possible, your response
should not include any personal privacy, proprietary,
or safeguards
information so that it can be placed in the PDR without redaction.
Should you have any questions
concerning this inspection, we will be pleased to discuss
them with you.
Sincerely,
Arthur T. Howe
III, Director
Division of Reactor Safety
Docket Nos.:
50-528; 50-529; 50-530
License Nos.: NPF-41; NPF-51; NPF-74
Enclosures:
1.
2.
NRC inspection Report
50-528/97-1 3; 50-529/97-1 3; 50-530/97-1 3
Sa
cc w/enclosure:
Mr. Steve Olea
Arizona Corporation Commission
1200 W. Washington Street
Phoenix, Arizona 85007
Douglas K. Porter, Senior Counsel
Southern California Edison Company
Law Department, Generation Resources
'P.O. Box 800
Rosemead,
California 91770
Chairman
Maricopa County Board of Supervisors
301 W. Jefferson,
10th Floor
Phoenix, Arizona 85003
Aubrey V. Godwin, Director
Arizona Radiation Regulatory Agency
4814 South 40 Street
Phoenix, Arizona 85040
Arizona Public Service Company
-3-
Angela K. Krainik, Manager
Nuclear Licensing
Arizona Public Service Company
P.O. Box 52034
Phoenix, Arizona 85072-2034
John C. Horne, Vice President
Power Supply
El Paso Electric Company
2025 N. Third Street, Suite 220
Phoenix, Arizona 85004
Terry Bassham,
Esq.
General Counsel
El Paso Electric Company
123 W. Mills
El Paso, Texas
79901
Mr. Robert Burt
Los Angeles Department of Water 5 Power
Southern California Public Power Authority
111 North Hope Street, Room 1255-B
Los Angeles, California 90051
Mr. David Summers
Public Service Company of New Mexico
Albuquerque,
New Mexico 87102
Mr. Brian Katz
Southern California Edison Company
14300 Mesa Road, Drop D41-SONGS
San Clemente, California 92672
Mr. Robert Henry
Salt River Project
6504 East Thomas Road
Scottsdale,
Arizona 85251
t
iJ
Arizona Public Service Company
-4-
report to T. Boyce (THB)
report to NRR Event Tracking System (IPAS)
report to Document Control Desk (DOCDESK)
report to Richard Correia (RPC)
report to Frank Talbot (FXT)
bcc to DCD (IE01)
bcc distrib. by RIV:
Regional Administrator
DRP Director
Branch Chief (DRP/F, WCFO)
Senior Project Inspector (DRP/F, WCFO)
Branch Chief (DRP/TSS)
WCFO File
Resident Inspector
DRS-PSB
MIS System
RIV File
M. Hammond (PAO, WCFO)
DOCUMENT NAME: R:i Pvipv713RP.JEW
To receive copy of document,
indicate In box: "C" = Copy without enclosures
"E" = Copy with enclosures
"N"= No copy
RIV:RI:MB
C:MB
E
D:DRP
D:DRS
JEWhittemore/Imb"
DAPowers
TPGwynn
ATHowell,III
05/29/97
" previously concurred
06/02/97
06/03/97
06/24/97
OFFICIAL RECORD COPY
i
Arizona Public Service Company
-4-
report to T. Boyce (THB)
report to NRR Event Tracking System (IPAS)
report to Document Control Desk (DOCDESK)
report to Richard Correia (RPC)
report to Frank Talbot (FXT)
bcc to DCD (IE01)
bcc distrib. by RIV:
Regional Administrator
DRP Director
Branch Chief (DRP/F, WCFO)
Senior Project Inspector (DRP/F, WCFO)
Branch Chief (DRP/TSS)
WCFO File
Resident Inspector
DRS-PS 8
MIS System
RIV File
M. Hammond (PAO, WCFO)
DOCUMENT NAME: R:7 PV'tPV713RP.JEW
To receive copy of document,
Indicate in box: "C" = Copy without enciosures
"E'
Copy with enciosures "N" = No copy
RIV:Rl:MB
JEWhittemore/Imb"
C:MB
E
D:DRP
DAPowers
TPGwyn
- DRS
THo
III
06/ /97
" previously concurred
06fH97
06/9/97
06
7
OFFICIAL RECORD COPY
i