ML17312B488

From kanterella
Jump to navigation Jump to search
Submits Timetable for Responding to RAI Re Plant Improved TS Schedule
ML17312B488
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/06/1997
From: Overbeck G
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
102-03954-JML-S, 102-3954-JML-S, NUDOCS 9706110197
Download: ML17312B488 (8)


Text

Cerunltment Inerrable. Eaergy.

Palo Verde Nuclear Generating Station James M. Levine Senior Vice President Nuclear TEL (602)393-5300 FAX(602)3936077 Mail Station 7602 P.O. Box 52034 Phoenix, AZ 65072-2034 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001 102-03954-JMUSAB/TNW June 6, 1997

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Improved Standard Technical Specifications (ITS) Schedule In order to utilize our resources in the most effective way, we are proposing the following timetable for responding to Requests for Additional Information (RAI's) related to the PVNGS ITS:

1.

For ITS Sections 1.0, 2.0, 3.4, 3.7 (completed May 30, 1997), 3.8, 3.9, 4.0, and 5.0; PVNGS will respond to the RAI's on or before July 18, 1997 2.

For ITS Sections 3.0, 3.1, 3.2, 3.3, 3.5, and 3.6; PVNGS will respond to the RAI's on or before September 19, 1997 The above timetable assumes all of the RAI's will be provided to PVNGS on or before June 18, 1997.

This timetable will enable PVNGS to maintain the current ITS implementation window of July 1, 1998 to September 15, 1998, provided the ITS SER is received prior to December 31, 1997.

Please contact Mr. Scott Bauer at (602) 393-5978 ifyou have any questions or would like additional information regarding this matter.

JMUSAB/TNW/mah Sincerely, CC:

E. W. Merschoff K. E. Perkins J. W. Clifford D. M. Orsini C. R. Thomas tgQO62 9706iiOi97 97060b PDR ADOCK 05000528 P

PDR

. lllllllllllllllllllllllllllllllllilllll

J I

U. S. Nuclear Regula ory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001 ITS Schedule Page 2

bcc:

FOR INTERNALDISTRIBUTIONONLY R. S. Yuhasz S. H. Pittalwala W. A. Wong D. A. Oakes T. C. Cannon A. W. Hartwig A. F. Swirbul M. S. Burns R. K. Roehler G. A. Michael T. N. Weber K. Roberson D. G. Marks S. A. Bauer A. K. Krainik 7668 7668 7545 7545 7545 7593 7593 7546 7636 7636 7636 7636 7636 7636 7636 CONCURRENCE:

W. A. Wong D. A. Oakes T. C. Cannon A. W. Hartwig A. F. Swirbul M. S. Burns T. N. Weber S. A. Bauer A. K. Krainik G. R. Overbeck 7545 7545 7545 7593 7593 7546 7636 7636 7636 7602

t II I

1 I

l I

lt II f

h

U. S. Nuclear Regula ory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001 ITS Schedule Page 2 bcc:

FOR INTERNALDISTRIBUTIONONLY R. S. Yuhasz S. H. Pittalwala W. A. Wong D. A. Oakes T. C. Cannon A. W. Hartwig A. F. Swirbul M. S. Burns R. K. Roehler G. A. Michael T. N. Weber K. Roberson D. G. Marks S. A. Bauer A. K. Krainik 7668 7668 7545 7545 7545 7593 7593 7546 7636 7636 7636 7636 7636 7636 7636 CONCURRENCE'.

A. Wong D. A. Oakes T. C. Cannon A. W. Hartwig A. F. Swirbul M. S. Burns T. N. Weber S. A. Bauer A. K. Krainik G. R. Overbeck 7545 7545~

754 7593 7593 7546 7636 7636 7636 7602

1

U. S. Nuclear Regula ory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001 ITS Schedule Page 3

VERIFICATIONOF ACCURACY No specific information used other than estimates from principle individuals including estimates for time to complete the work, availability of individuals, and meetings for PRB and OSRC.

COMMITMENTS/ACTIONPLAN Stated or Im lied 1.

RCTS 042401, Respond to RAI on ITS Section 3.8, "Electrical Power Systems".

2.

RCTS 042408, Respond to RAI on ITS Section 3.4, "RCS".

3.

RCTS 042409, Respond to RAI on ITS Chapter 5.0, "Administrative Controls".

4.

RCTS 042433, Respond to RAI on ITS Section 3.9, "Refueling Operations" 5.

RCTS, Respond to RAI on ITS Chapters 1.0, 2.0, and 4.0, "Use and Application", "Safety Limits", and "Design Features" 6.

RCTS,Respond to RAI on ITS Sections 3.0, 3.1, and 3.2, "SR and LCO Applicability","Reactivity Control Systems", and "Power Distribution Limits" 7., RCTS

,Respond to RAI on ITS Section 3.5, "ECCS'.

RCTS, Respond to RAI on ITS Section 3.6, "Containment Systems" Allof the above RCTS items are owned by NRA, Section Leader Scott A. Bauer.

CHANGES TO UFSAR None

~-

  • ~

~

'