ML17312B483
| ML17312B483 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 05/30/1997 |
| From: | Ide W ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 102-03946-WEI-S, 102-3946-WEI-S, NUDOCS 9706100129 | |
| Download: ML17312B483 (5) | |
Text
CATEGORY j.
REGULAT INFORMATION DISTRIBUTIONSTEM (RIDE)
ACCESSION NBR:9706100189 DOC.DATE: 97/05/30 NOTARIZED:
NO
'OCKET I FACIAL:SpN-50-528 Palo Verde Nuclear Station, Unit 1, Ariz'ona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION IDEFW;E.
Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Informs of determination that Unit 1 ampacity evaluations will not bound Units 2
& 3.Unit-specific ampacity evaluations for Thermo-Lag 330-1 enclosed raceways for Units 2
6 3 will be completed by 971231.
DISTRIBUTION CODE:
A001D COPIES RECEIVED:LTR I
ENCL 0 SIZE:
L/
TITLE: OR Submittal: General Distribution NOTES:STANDARDIZED PLANT Standardized plant.
Standardized plant.
05000528 05000529 05000530 RECIPIENT ID CODE/NAME PD4-2 LA CLIFFORDFJ INTERNAL: ACRS NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS2 EXTERNAL: NOAC COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD4-2 PD FILE CENTER 1
NRR/DSSA/SPLB NUDOCS-ABSTRACT NRC PDR COPIES LTTR ENCL NOTE TO ALL "RIDSM RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE CONTACT THE DOCUMENT CONTROL DESK4 ROOM OWFN SD-5(EXT. 415"2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T HEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 14 ENCL B
'R O~
I I
Commttment. Innoratton. bergy.
1 Palo Verde Nuclear Generating Station
, William E. Ide Vice President Nuclear Engineering TEL 602/393-6116 FAX 602I3934077 Mail Station 7605 P.O. Box 52034 Phoenix, AZ 85072-2034 102-03946-WEI/SAB/RMW May 30, 1997 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 60-628/629/630 Ampacity Calculations Update Arizona Public Service Company letter 102-03854-WEI/SAB/NLT, dated January 24, 1997, stated that APS anticipated the ampacity evaluation performed for Unit 1 would bound Units 2 and 3 and that APS would verify the applicability of the Unit 1 ampacity evaluation to Units 2 and 3 by the end of the second quarter of 1997.
Due to differences in configuration between the units, APS Design Engineering has determined that the Unit 1 evaluation will not bound Units 2 and 3.
Therefore, APS will complete unit-specific ampacity evaluations for Thermo-Lag 330-1 enclosed raceways for Units 2 and 3. These evaluations are scheduled to be completed by December 31, 1997.
Please contact Mr. Scott Bauer at (602) 393-5978 ifyou have any questions or comments.
Sincerely, WEI/SAB/RMW/mah cc:
E. W. Merschoff K. E. Perkins J. W. Clifford K. E. Johnston
')~ (>> I970biOOi29 970530 PDR.';ADOCK 05000528 P
PDR lllllllllillllllllllllllllllllllllllll,
U.~S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001 Page 3 VERIFICATIONOF ACCURACY APS letter 102-03854-WEI/SAB/NLT, dated January 24, 1997.
COMMITMENTS/ACTIONPLAN Stated or Im lie'd 1.
Complete unit-specific ampacity evaluations for raceways enclosed with Thermo-Lag 330-1 for Units 2 and 3.
RCTS No. 042435 Due Date:
December 31,1997.
Responsible Organization:
Design Engineering, Electrical Distribution S. L. Garrett, M. S. Burns CHANGES TO UFSAR NONE
0 p
n 4
r
)porn I
,t l
I 4
8 t'i "s II