Advises of Planned Inspection Effort Resulting from 970325 Palo Verde Semiannual Plant Performance Review.Detail Inspection Plan for Next 8 Months Encl
ML17312B427
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 05/05/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: James M. Levine
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
References
NUDOCS 9705130083
Download: ML17312B427 (9)


Text

~p,g AEQUI 0

.:. ~~~gLg:-.

+k*

UNITED STATES NUCLEAR REGULATORY COMMISSION

, REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON,TEXAS 76011 8064 MAY -5 95";

James M. Levine, Senior Vice President, Nuclear Arizona Public Service Company P.O. Box 53999 Phoenix, Arizona 85072-3999

SUBJECT:

SEMIANNUALPLANT PERFORMANCE REVIEW (SPPR)

- PALO VERDE

Dear Mr. Levine:

On March 25, 1997, the NRC staff completed the SPPR of Palo Verde.

The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance.

The results are used by NRC management to facilitate planning and allocation of inspection resources.

The SPPR for Palo Verde involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period from October 1, 1996, through March 1997.

SPPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance and Senior Management Meeting reviews.

This letter advises you of our planned inspection effort resulting from the Palo Verde SPPR review.

It is provided to minimize the resource impact on your staff and to all f

sched sc e uling conflicts and personnel availability to be resolved in advance of inspector arrival onsite.

The enclosure details our inspection plan for the next 8 months.

The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas."

Resident inspections are not listed due to their ongoing and continuous nature.

We will inform you of any changes to the inspection plan.

If you have any questions, please contact Mr. Dennis Kirsch at (510)-975-0290.

Sincerely, omas P. Gwynn, Division of Reactor ir ctor jects Docket Nos.: 50-528 50-529 50-530 License Nos.: NPF-4 NPF-51 NPF-74 9705i30083 970505 PDR ADQCK 05000528 8

PDR

Arizona Public Service Company

Enclosure:

Inspection Plan cc w/enclosure:

Mr. Steve Olea Arizona Corporation Commission 1200 W. Washington Street Phoenix, Arizona 85007 Douglas K. Porter, Senior Counsel Southern California Edison Company Law Department, Generation Resources P.O. Box 800

Rosemead, California 91770 Chairman Maricopa County Board of Supervisors 301 W. Jefferson, 10th Floor Phoenix, Arizona '85003 Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 South 40 Street Phoenix, Arizona 85040 Angela K. Krainik, Manager Nuclear Licensing Arizona Public Service Company P.O. Box 52034 Phoenix, Arizona 85072-2034 John C. Horne, Vice President Power Supply El Paso Electric Company 2025 N. Third Street, Suite 220 Phoenix, Arizona 85004 Terry Bassham, Esq.

General Counsel EI Paso Electric Company 123 W. Mills El Paso, Texas 79901

Arizona Public Service Company Mr. Robert Burt Los Angeles Department of Water 5 Power Southern California Public Power Authority 111 North Hope Street, Room 1255-B Los Angeles, California 90051 Mr. David Summers Public Service Company of New Mexico 414 Silver SW, ¹0604 Albuquerque, New Mexico 87102 Mr. Brian Katz Southern California Edison Company 14300 Mesa Road, Drop D41-SONGS San Clemente, California 92672 Mr. Robert Henry Salt River Project 6504 East Thomas Road Scottsdale, Arizona 85251

Arizona Public Service Company MAY -5

':""-7 bcc to DCD IE01 bcc distrib. by RIV:

Regional Administrator DRP Director Branch Chief (DRP/F, WCFO)

Senior Project Inspector (DRP/F, WCFO)

Branch Chief (DRP/TSS)

WCFO File Resident Inspector DRS-PSB MIS System RIV File M. Hammond (PAO, WCFO)

DOCUMENT NAME:

To receive copy of document, indicate In box: "C" = Copy witho t enclosures "E" = Copy with enclosures "N" = No copy RIV:PI:DRP/F E

C: DRP/F E

D:DR D:DRP DGAcker 04/1 0/97 DFKirsch 04/10/97 ATHo'll TPGw nn 0

/97 0

/97 OFFICI L RECORD COPY

Arizona Public Service Company NY -5.--7 bcc to DCD IE01 bcc distrib. by RIV:

Regional Administrator DRP Director Branch Chief (DRP/F, WCFO)

Senior Project Inspector (DRP/F, WCFO)

Branch Chief (DRP/TSS)

WCFO File Resident Inspector DRS-PS 8 MIS System RIV File M. Hammond (PAO, WCFO)

DOCUMENT NAME:

To receive copy of document, indicate in box: "C" = Copy witho enclosures "E" = Copy with enciosures "N" = No copy RIV:PI:DRP/F E

C:DRP/F E

D:DR D:DRP DGAcker 04/10/97 DFKirsch 04/10/97 ATHo ell TPGw nn 0

/97 0

/97 OFFICI L R CORD COPY

PALO VERDE NUCLEAR GENERATING STATION INSPECTION PLAN IP - Inspection Procedure Tl - Temporary Instruction Core Inspection - Minimum NRC Inspection Program (mandatory all plants)

INSPECTION TITLE/

PROGRAM AREA NUMBER OF INSPECTORS PLANNED INSPECTION DATES TYPE OF INSPECTION COMMENTS IP 37550 Engineering IP 82301 EP Exercise IP 83750 Occupational Radiation Exposure IP 82701 EP Operational Status IP 81700 Physical Security Program for Power Reactors 2

05/19-23/97 Core Inspection 06/02-06/97 05/20-23/97 Core Inspection 06/23-27/97 Core Inspection 06/30-07/03/97 Core Inspection 07/28-08/01/97 Core Inspection IP 40500 Effectiveness of Licensee Controls in Identifying, Resolving, and Preventing Problems 08/04-08/97 Core Inspection 08/1 8-22/97 Tl 133 Solid Radioactive Waste IP 86750 Management and Transportation of Radioactive Materials 10/06-10/97 Safety Issue and Core Inspection