ML17312B388
| ML17312B388 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 04/22/1997 |
| From: | Howell A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | James M. Levine ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| Shared Package | |
| ML17312B389 | List: |
| References | |
| NUDOCS 9704250111 | |
| Download: ML17312B388 (11) | |
See also: IR 05000528/1997002
Text
CATEGORY 2
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
DOCKET I
05000528
05000529
05000530
SUBJECT:
Forwards
insp repts
50-528/97-02,50-529/97-02
& 50-530/97-02
on 970324-28.No violations identified.Insp included
evaluation of four applicants for
SRO licenses
& two
applicants .for
RO licenses.
DISTRIBUTION CODE:
IE42F
COPIES
RECEIVED:LTR / ENCL i SIZE: 5 +22Z
TITLE: Operator Licensing Examination Reports
ACCESSION NBR:9704250111
DOC.DATE: 97/04/22
NOTARIZED:
NO
ACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi
STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi
STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi
AUTH.NAME
" AUTHOR AFFILIATION
HOWELL,A.T.
Region
4 (Post
820201)-
RECIP.NAME
RECIPIENT AFFILIATION
LEVINE,J.M.
Arizona Public Service
Co. (formerly Arizona Nuclear
Power
C
NOTES:STANDARDIZED PLANT
Standardized
plant.
Standardized
plant.
05000528
Q
',
05000529
05000530
Q
RECIPIENT
ID CODE/NAME
PD4-2
.
INTERNAL: ACRS
NRR/DRCH/HHFB
RGN4
FILE
01
TERNAL: NOAC
COPIES
LTTR ENCL
1"'
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
CLIFFORD,J
ENT
NRR/DRCH HOLB
NRC PDR
COPIES
LTTR ENCL
1
1
1
1
'1
1
1
1
- 'Y
D
U
DFFOV
AfRQjggppg
~E
N
NOTE TO ALL "RZDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS
OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION4 CONTACT THE DOCUMENT CONTROL
DESK
(DCD)
ON EXTENSION 415 2083
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
9
ENCL
9
[
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZA DRIVE, SUITE 400
APR 22 l997
James
M. Levine, Senior Vice
President,
Nuclear
Arizona Public Service Company
P.O. Box 53999
Phoenix, Arizona 85072-3999
SUBJECT:
NRC INSPECTION REPORT 50-528/97-02; 50-529/97-02; 50-530/97-02
Dear Mr. Levine:
An NRC inspection was conducted
March 24-28, 1997, at your Palo Verde Nuclear
Generating Station, Units 1, 2, and 3, reactor facilities. The enclosed report presents the
scope and results of that inspection.
The inspection included an evaluation of four applicants for senior'reactor operator licenses
and two applicants for reactor operator licenses.
We determined that all of the applicants
satisfied the requirements
and the appropriate licenses have been issued.
The applicants
performed well in all portions of the examination and exhibited excellent operational skills.
The quality of the draft examination submitted by your staff had improved overall relative
to the last submittal in November 1996, especially the written examination questions.
However, we requested that your staff significantly revise the examination to satisfy our
expectations for facility licensee-developed
initial examinations.
These revisions were
necessary
to satisfy the NRC's individual test item quality expectations
which had been
recently clarified to the regional staff. We regret the impact this imposed on your staff,
but at the same time, we commend them for their prompt and effective efforts to enhance
the quality of the examinations.
In order to more clearly articulate NRC's expectations,
we will be hosting
a workshop on
facility licensee-developed
examinations
on May 29-30, 1997.
We will provide details of
this workshop in separate
correspondence.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter
and its enclosure will be placed in the NRC Public Documen; Room (PDR).
pcs>)
9704250iii 970422
IIIIDOCK 05000528
8
IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
Arizona Public Service Company
-2-
Should you have any questions concerning this inspection, we will be pleased to discuss
them with you.
Since ely,
rthur T. Ho
ell III, Director
Division of Reactor Safety
Docket Nos.:
50-528; 50-529; 50-530
License Nos.:
Enclosure:
NRC Inspection Report
50-528;-529;-530/97-02
cc w/enclosure w/o Attachment 3:
Mr. Steve Olea
Arizona Corporation Commission
1200 W. Washington Street
Phoenix, Arizona 85007
Douglas K. Porter, Senior Counsel
Southern California Edison Company
Law Department, Generation Resources
P.O, Box 800
Rosemead,
California 91770
Chairman
Maricopa County Board of Supervisors
301 W. Jefferson,
10th Floor
Phoenix, Arizona 85003
Aubrey V. Godwin, Director
Arizona Radiation Regulatory Agency
4814 South 40 Street
Phoenix, Arizona 85040
Angela K. Krainik, Manager
Nuclear Licensing
Arizona Public Service Company
P.O. Box 52034
Phoenix, Arizona 85072-2034
I
i
M
Arizona Public Service Company
-3-
John C. Horne, Vice President
Power Supply
El Paso Electric Company
2025 N. Third Street, Suite 220
Phoenix, Arizona 85004
Terry Bassham,
Esq.
General Counsel
El Paso Electric Company
123 W. Mills
El Paso, Texas
79901
Mr. Robert Burt
Los Angeles Department of Water 5 Power
Southern California Public Power Authority
111 North Hope Street, Room 1255-B
Los Angeles, California 90051
Mr. David Summers
Public Service Company of New Mexico
Albuquerque, New Mexico 87102
Mr. Brian Katz
Southern California Edison Company
14300 Mesa Road,.Drop D41-SONGS
San Clemente, California 92672
Mr. Robert Henry
Salt River Project
6504 East Thomas Road
Scottsdale,
Arizona 85251
Arizona Public Service Company
-4-
E-Mail report to T. Boyce (THB)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
bcc tc DC~IIE42I
bcc distrib. by RIV: w/o Attachment 3
Regional Administrator
DRP Director
Branch Chief (DRP/F, WCFO)
Senior Project Inspector (DRP/F, WCFO)
Branch Chief (DRP/TSS)
WCFO File
Resident Inspector
DRS-PSB
MIS System
RIV File
M. Hammond (PAO, WCFO)
w/all attachments
S. Richards (HOLB/NRR)
L. Hurley
DOCUMENT NAME: R:i PViPV702RP.SLM
To receive copy of document,
indicate in box: "C" = Copy without enclosures
"E" = Copy with enclosures "N"= No copy
RIV:RE:OB
E
SLMcCrory/Imb"
04/09/97
C:OB
JLPellet"
04/9/97
D:DRP
TPGwynn"
04/10/97
D:DRS
ATHowell"
04/22/97
"Previously concurred
OFFICIAL RECORD COPY
ij
Arizona Public Service Company
4-
E-Mail report to T. Boyce (THB)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
bcc to DCD (IE01)(IE42)
bcc distrib. by RIV: w/o Attachment 3
Regional Administrator
DRP Director
Branch Chief (DRP/F, WCFO)
Senior Project Inspector (DRP/F, WCFO)
Branch Chief (DRP/TSS)
WCFO File
Resident Inspector
DRS-PSB
MIS System
RIV File
M. Hammond (PAO, WCFO)
w/all attachments
S. Richards (HOLB/NRR)
L. Hurley
DOCUMENT NAME: R:3 PV>PV702RP.SLM
To receive copy of document,
Indicate ln box: "C" ~ Copy without enclosures
"E" = Copy with enclosures
"N"= No copy
RIV:RE:OB
E
C:OB
D:DRP
D:DRS
SLMcCrory/Imb"
04/09/97
JLPellet"
04/9/97
TPGwynn"
04/10/97
ATHowell"
04/22/97
"Previously concurred
OFFICIAL RECORD COPY