Informs of Commitment Rev in Response to Violations Noted in Insp Rept 50-529/96-06.Alignment Sys Final Installation Will Be Completed in Unit 1 Refueling Outage (1R7) in Spring of 1998
ML17312B355
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 04/03/1997
From: James M. Levine
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
102-03907-JML-A, 102-3907-JML-A, NUDOCS 9704090169
Download: ML17312B355 (10)


Text

CATEGORY REGUL'%RY INFORMATION DISTRIBUTE "SYSTEM (RIDE)

I

~

ACCESSION NBR:9704090169 DOC.DATE: 97/04/03 NOTARIZED:

NO DOCKET

()

"ANIL:S'ZN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 AUTH.NAME AUTHOR AFFILIATION EVINE,J.M.

Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) c7$

g/o

SUBJECT:

Informs of commitment rev in response to violations noted in insp rept 50-529/96-06.Alignment sys final installation will be completed in Unit 1 refueling outage (1R7) in spring of 1998.

DISTRIBUTION CODE:

IE01D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:Standardized plant.

05000529 RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: ACRS F

E CENTER C

HHFB NRR/DRPM/PERB OE DIR RGN4 FILE 01 COPIES LTTR ENCI 1

1 2

2 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME CLIFFORDFJ AEOD/SPD/RAB DEDRO NRR/DISP/PIPB NRR/DRPM/PECB NUDOCS-ABSTRACT OGC/HDS2 COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 1

1

" EXTERNAL: LITCO BRYCEFJ H

NRC PDR 1

1 1

1

- NOAC NUDOCS FULLTEXT 1

1 1

1 D

E N

NOTE TO ALL URIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.

TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE"NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 20 ENCL 20

I e

,M~r Commtaiieiit. lmxnstfm Enemy.

Palo Verde Nuclear Generating Station James M. Levine Senior Vice President Nuclear TEL (602)393-5300 FAX(602)393-6077 Mail Station 7602 P.O. Box 52034 Phoenix, AZ 65072-2034 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station: P1-37 Washington, DC 20555-0001 102-03907-JML/AKK/RJH April 3, 1997

Reference:

Letter 102-03728-WLS/AKK/RJH dated July 03, 1996 from W. L. Stewart to the U.S. NRC Document Control Desk

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Revision of Commitments for Notice of Violation 50-529/96-06-01 In response to the concern identiTied in the subject violation, Arizona Public Service e

Company (APS) previously committed to implement a design modification to install a more positive alignment system for the upper guide structure during each Unit's respective refueling outage with final installation scheduled for Unit 2 in November 1997.

During the 1996 Fall outage for Unit 1, we experienced problems with the guide structure liftrig bushing and elected to also modify the bushing as part of the alignment system modification.

Because of this added scope of work, we were not able to complete the revised modification during the Unit 1 outage.

However, the modification has been successfully installed during the Unit 3 refueling outage in March 1997 and is currently scheduled for installation in Unit 2 in September 1997, with final installation scheduled for the next Unit 1 refueling outage.

Therefore we are revising our initial commitment to state that the alignment system final installation will be completed in the Unit 1 refueling outage (1R7) in the spring of 1998.

Should you have any further questions, please contact Ms. Angela K. Krainik at (602) 393-5421.

9704090i69 970403 PDR-ADQCK 0500052'it 8

PDR JML/AKK/RJH/rlh Sincerely, e-E. W. Merschoff J. W. Clifford K. E. Perkins D. A. Powers K. E. Johnston ortega)ar>gutiaoialtma~aamr

f l4 I(

4

INTERNALDISTRIBUTIONONLY 1.

10CFR2.201 Notice ofViolation 2.

10CFR2, Appendix C, Section Vl, A. Notice ofViolation 3

CRDR Investigation 260049 4.

NRC Inspection Report 50-528/529/530/96-06 Previous commitment:

0 Due Date: November 15, 1996 Due Date: November 15, 1997 Due Date: May 15, 1997

~ Implement in each Unit the alignment system designed for positive alignment of the UGS in the storage pit.

David Mauldin Unit 1 Priority 3

Unit 2 Priority 3

Unit 3 Priority 3

New Commitment:

~

Implement in each Unit the alignment system designed for positive alignment of the UGS in the storage pit.

David Mauldin Unit 1 Priority Unit 2 Priority Unit 3 Priority

f E

l l

I l

0 INTERNALDISTRIBUTIONONLY bcc:

G. R. Overbeck W. E. Ide.

J. H. Hesser D. M. Smith T. L. Radtke C. D. Mauldin M. E. Powell M. A. Radspinner S. H. Pittalwala P. A. Oreshack M. J. Winsor C. J. Wandell R. W. Field L. K. Houghtbby D. M. Marks N. E. Meador CRDR Admin (7602)

, (7616)

(7669)

(7294)

(7299)

(7299)

(7543)

(7543)

(7668)

(7668)

(6301)

(7536)

(6301)

(7616)

(7636)

(7636)

(7997)

Concurrence:

D. Marks A. Krainik W. Ide S. Pittalwala G. Overbeck

]I Ii tl 1g I,

ll 1

I h

e PVNGS Document Authorization Routing Slip LBTER NO'UCLEAR REGULATORYAFFAIRS DATE'/03/97 S

lal tnatruettonat Draft File Name: H.WRAWOVSSOthOC

=BRIEF, DESCRIPTION:

Revision to Commitment for NOV 96-06-01 UGS Modification E TO NRC (Orotherreguiatory agency)

ON".HARD DUE DATE: Yes No XX TO FINALAPPROVER Target Date:

4/03/97 Revtewor 3 De Poor to Drro De to Actual Date:

I I

to Final Revtovrer Roeo Signature Date:

I I

p'oFtnel to rovork1.otter Deto 1.

W. E. Ide ROUTE TO INDNIDUAL STA.

7616 SIGNATURE REQUIRED REVIEW REQUIRED DATE REVIEWEDIAPPROVED COMMENTS 2.

G. R. Overbeck 3.

A. K. Krainik 7602 7636

4. J.M.Levine 7602 5.

RETURN TO:Rosemary STA: 7636 FOR QUESTIONS, CONTACT: Rick HazehNood EXT.: 5868

)

II