CATEGORY 1 REGULATOR%INFORMATION DISTRIBUTION ~EM (RZDB)
ACCESSION NBR:9703260173 DOC.DATE: 97/03/18 NOTARIZED: NO DOCKET FACIL:STN-.50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION IDEFW.E.
Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Requests NRC review of revised grid stability analysis under emergency circumstances.
DISTRIBUTION CODE:
A001D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal: General Distribution NOTES:STANDARDIZED PLANT Standardized plant.
Standardized plant.
RECIPIENT ID CODE/NAME PD4-2 LA CLIFFORD,J INTERNAL: ACRS NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS2 EXTERNAL: NOAC COPIES LTTR ENCL 1
1 1
1 1,
RECIPIENT ID CODE/NAME PD4-2 PD FILE CENTE 01 MCB NRR/DSSA/SPLB NUDOCS-ABSTRACT NRC PDR COPIES LTTR ENCL 05000528 05000529 G
'5000 0
D E
N NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 14 ENCL
Cw
Palo Verde Nuclear Generating Station WilliamE. Ide Vice President Nuclear Engineering TEL 602/393-6116 FAX 602/3934077 Mail Station 7605 P.O. Box 52034 Phoenix, AZ 85072-2034 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001 102-03893 - WEI/AKK/SAB March 18, 1997
Dear Sirs:
SUBJECT:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Request for NRC Review of Revised Grid Stability Analysis Under Emergency Circumstances
(
V I
Pursuant to a
conversation "with the NRC. Project Manager for Palo Verde on March17,1997, APS is hereby requesting that an unreviewed safety question submitted to the NRC by letter 102-03832-JML/AKK/DRL dated December 27, 1996, Request for NRC Review of Revised Grid Stability Analyses, be reviewed and approved under emergency circumstances in accordance with 10 CFR 50.91 (a) (5).
The emergency circumstances exist because APS was informed on March 11, 1997 that the current application of NRC policy regarding unreviewed safety questions is that plants may not restart following outages with an outstanding unreviewed safety question.
Subsequently, on March 17, 1997, APS was informed that this amendment request hd tt ti di tt ~F'd,tl f, lddt processed under emergency circumstances.
Palo Verde Unit 3 is currently in a refueling outage and is scheduled to enter Mode 2 on March 28, 1997.
As such, sufficient time does not exist to process the unreviewed safety question pursuant to 10 CFR 50.91 (a)
(2) with a 30-day notice period.
Therefore, an emergency situation exists in that failure to act in a timely way would prevent-resumption of'operation.
The emergency circumstances.
did not result from APS failing to act in a timely manner as the amendment request was submitted on December 27, 1996.
9703260173 970318 PDR ADQCK 05000528 P
PDR c) p @AD)
IllmlllltlllItGIIHII9tjllllIIlllIlfllllll
P LI
~ II.!'u
>0 4= I, II
U.S. Nuclear Regulatory Commisssion Request for NRC Review of Revised Grid Stability Analysis Page'2-In order to support restart of Unit 3, it is requested that the subject amendment be issued by close of business on March 27, 1997.
Should you have any questions, please contact Scott A. Bauer at (602) 393-5978.
Sincerely, WEI/AKK/SAB/mah Enclosure cc:
E. W. Merschoff K. E. Perkins J. W. Clifford K. E. Johnston A. V. Godwin (ARRA)
~J t
It 11
U.S. Nuclear Regulatory Commisssion Request for NRC Review of Revised Grid Stability Analysis Page'3 FOR INTERNALDISTRIBuTION ONLY bcc:
S. A. Bauer A. K. Krainik W. E. Ide (7636)
(7636)
(7616)
C C
C S. A. Bauer A. K. Krainik W. E. Ide LTR 102 - 03832 JML/AKK/DRLdated December 27, 1996 10CFR 50.91 None None
~
~
~(
Oi L