ML17312B221
| ML17312B221 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 02/06/1997 |
| From: | James M. Levine ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 102-03862-JML-A, 102-3862-JML-A, NUDOCS 9702120035 | |
| Download: ML17312B221 (4) | |
Text
CATEGORY j.
@4' REGULATE'NFORMATZON DZSTRZBUTZONZSTEM (RZDS)
ACCESSION NBR 9702120035 DOC.DATE: 97/02/06 NOTARIZED:
NO DOCKET FACIL:S'1~N-'50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit '2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION LEVINE,J.M.
Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Informs NRC that util will be conducting voluntary initiative to review PVNGS FSAR.
DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal: General Distribution A,
NOTES:STANDARDIZED PLANT Standardized plant.
Standardized plant.
RECIPIENT ID CODE/NAME PD4-2 LA CLIFFORD,J INTERNAL: ACRS NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS2 EXTERNAL: NOAC COPIES LTTR ENCL 1
1 1
1l.
RECIPIENT ID CODE/NAME PD4-2 PD R
NRa/aE/BMeB NRR/DSSA/SPLB NUDOCS-ABSTRACT NRC PDR COPIES LTTR ENCL E
05000528 05000529 Q
'5 0
D N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
P TOTAL NUMBER OF COPIES REQUIRED:
LTTR 14 ENCL
0 Palo Verde Nuclear Generating Station James M. Levine Senior Vice President Nuclear
'(
TEL (602)393-5300 FAX (602)3934077 Mail Station 7602 P.O. Box 52034 Phoenix, AZ 85072-2034 102-03862-JML/AKK/R JR February 6, 1997 U. S. Nuclear Regulatory Commission A%I N: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1,2, and 3 Docket Nos. STN 50-528/529/530 Voluntary Initiative to Review Final Safety Analysis Report (FSAR)
On October 18,1996, the NRC published revisions to its "General Statement of Policy and Procedure for Enforcement Actions" to address issues associated with departures from the FSAR, 61 Fed. Reg. 54,461 (October, 18, 1996).
The purpose of this letter is to inform the NRC that Arizona Public Service (APS) will be conducting a voluntary initiative to review the PVNGS FSAR. Additionally, on January 9, 1997 the NRC issued minutes of a November 12, 1996 meeting with APS in which this voluntary initiative was discussed.
This letter also provides clarification of the intended scope of this initiative as described in those meeting minutes.
The review willverify plant design, operating, testing, and configuration information and descriptions contained in the PVNGS FSAR against the "as-built", "as-operated",
and "as-tested" plant as well as the reconstituted design basis. The review will use the PVNGS Condition Reporting process to document and correct any identified discrepancies.
The Condition Reporting process includes the attributes of root cause, operability determination, and reportability.
This voluntary initiative willcommence in February 1997, and be completed by October 1998.
Any changes to the FSAR as a result of this effort will be incorporated in the normal 10 CFR 50.71(e) update of the FSAR.
oL
~, 97O2<a00SS 970206
> PDR
,",ADQCK 05000528 K
-'DR
0 E%
. U.S. Nuclear Regulatory ommission ATTN: Document Control Desk Voluntary Initiative to Review Final Safety Analysis Report Page 2 Should you have any questions, please contact Scott A. Bauer at (602) 393-5978.
Sincerely,
/0 JML/AKK/R JR/rlh cc: