CATEGORY 1 REGULAT INFORMATION DISTRIBUTION STEM (RIDS) f ACCESSIbN,NBR:9702070136 DOC.DATE: 97/Ol/31 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION LEVINE,J.M.
Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Informs that improved std TS implementation window for plant based upon 980701-0901 submitted factors.
DISTRIBUTION CODE:
AOOID COPIES RECEIVED:LTR L ENCL 0 SIZE:
TITLE: OR Submittal: General Distribution NOTES:STANDARDIZED PLANT Standardized plant.
Standardized plant.
RECIPIENT ID CODE/NAME PD4-2 LA CLIFFORD,J 1NTERNAL: ACRS NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS2 EXTERNAL: NOAC COPIES LTTR ENCL 1
1 1
1 1'ECIPIENT ID CODE/NAME PD4-2 PD ILE CENTER~3l NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT NRC PDR COPIES LTTR ENCL E
05000528 05000529 G
05000530 0
D 0
N NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D<<5(EXT. 415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 14 ENCL
0 Commitment. tnmnrntton. Energy.
Palo Verde Nuclear Generating Station James M. Levine Senior Vice President Nuclear TEL (602)393-5300 FAX (602)3934077 Mail Station 7602 P.o. Box 52034 Phoenix, AZ 65072-2034 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, D.C. 20555 102-03857-JLM/AKK/SAB January 31, 1997
Reference:
Letter No. 102-03794, dated October 4, 1996, "License Amendment Request for Conversion to the Improved Standard Technical Specifications (ITS)"
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket No. STN 50-528/529/530 Improved Standard Technical Specifications The referenced letter transmitted the License Amendment Request for the PVNGS conversion to the Improved Standard Technical Specifications (ITS) and included a
commitment to provide a scheduled date for ITS implementation.
Subsequent to the ITS submittal, PVNGS has performed a sitewide impact review and developed an ITS implementation plan.
The implementation plan is based upon several factors which include, but are not limited to:
~
NRC approval of the ITS prior to August 15, 1997
~
Completion of the ITS procedure changes prior to ITS implementation
~
Completion of the ITS programs prior to ITS implementation
~
Training of site personnel prior to ITS implementation
~
Implementation between refueling outages, when all three PVNGS units are operating The ITS implementation window for PVNGS based upon the above factors is July 1, 1998 to September 15, 1998.
Should you have any questions, please contact Scott A. Bauer at (602) 393-5978.
Sincerely, OV0004 9702070i36 970i3i PDR ADQCK 05000528 P