ML17312B022
| ML17312B022 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 10/30/1996 |
| From: | James M. Levine ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 102-03801-JML-S, 102-3801-JML-S, GL-96-06, GL-96-6, NUDOCS 9611060248 | |
| Download: ML17312B022 (3) | |
Text
CATEGORY 1 DISTRIBUTION CODE:
A072D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: GL 96-06, "Assurance of Equip Oprblty
& Contain.Integ.
during Design 05000528 05000529 05000530 NOTES:STANDARDIZED PLANT Standardized plant.
Standardized plant.
REGULRT INPORl4ATION DISTRIBUTION+STEM (RIDE)
ACCES'SION NBR:9611060248 Doc.bATE: 96/10/30 NOTARIZED: NO DOCKET I FACIL STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STD-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION LEVINE,J.M.
Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME
'ECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Advises that requested info will be submi'tted to NRC re GL 96-06, "Assurance of Equipment Operability 6 Containment Integrity During Design-Basis Accident Conditions," within 120 days.
A T
RECIPIENT ID CODE/NAME NRR/WETZEL,B.
CLIFFORD,J INTERNA LE CENTER 1
NRR/DSSA SCSB EXTERNAL: NOAC COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD4-2 PD NRR/DE/EMEB NRR/DSSA/SPLB NRC PDR COPIES LTTR ENCL 1
1 0
N NOTE TO ALL "RIDSN RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 9
ENCL
I l
ti 1
Commttmnnt. Innmmttnn. Eneyy.
i Palo Verde Nuclear Generating Station James M. Levine Senior Vice President Nuclear TEL (602)393-5300 FAX (602)3934077 Mail Station 7602 P.o. Box 52034 Phoenix, AZ 85072-2034 102-03801-JML/SAB/JRP October 30, 1996 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Reference:
NRC Generic Letter 96-06: Assurance Of Equipment Operability And Containment Integrity During Design-Basis Accident Conditions, dated September 30, 1996
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units1,2, and 3.
Docket Nos. STN 50-528/529/530 Response to NRC Generic Letter 96-06 This letter provides the 30 day response to NRC Generic Letter 96-06. Arizona Public Service Company (APS) intends to complete the actions requested by the Generic Letter and will submit the requested information within the 120 day time period.
Should you, have any questions, please contact Scott A
Bauer at (602) 393-5978.
Sincerely, JML/SAB/JRP cc:
L. Callan K. Perkins J. Clifford K. Johnston 9biiOb0248 9bi030,',>>
PDR ADQCK 05000528:
P PDR