ML17312A979
| ML17312A979 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 09/18/1996 |
| From: | James M. Levine ALABAMA PUBLIC SERVICE CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 102-03777-JML-A, 102-3777-JML-A, NUDOCS 9609270105 | |
| Download: ML17312A979 (4) | |
Text
CATEGORY 1 REGULA Y INFORMATION DISTRIBUTION YSTEM (RIDS)
CCESSION NBR:9609270105 DOC.DATE: 96/09/18 NOTARIZED: NO ACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona publi AUTH.NAME AUTHOR AFFILIATION LEVINE,J.M.
Alabama Public Service Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Infor'ms that util will establish specific structural performance criteria, including necessary procedure revs to clarify,when structures should be moved to Category (a)(l) by 961017 re NRC Insp Repts.
DISTRIBUTION CODE:
IE01D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:STANDARDIZED PLANT Standardized plant.
Standardized plant.
DOCKET 05000528 05000529 05000530 i9d-dP G
05000528 05000529 0 05000530 R
RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: ACRS FILE CENTE R
DRCH HHFB NRR/DRPM/PERB OE DIR RGN4 FILE 01 EXTERNAL: LITCO BRYCE,J H
NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME CLIFFORDiJ AEOD/SPD/RAB DEDRO NRR/DISP/PIPB NRR/DRPM/PECB NUDOCS-ABSTRACT OGC/HDS2 NOAC COPIES LTTR ENCL D
C N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 19 ENCL
l l
I I
l l
f i
i J
I I
I
Palo Verde Nuclear Generating StaUon James M. Levine Vice President Nuclear Production TEL (602)3S3-5300 Mall Station 7602 FAX(602)3936077 P.O. Box 52034 http:lhvww.apse.corn Phoenbr, AZ65072-2034 102-03777-JML/AKK/DRL September 18, 1996 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 NRC Inspection Report 50-528/529/530-96-09 In the Nuclear Regulatory Commission's (NRC) Inspection Report (IR) 50-528/529/530-96-09, dated August 21,
- 1996, confirmation was requested by the NRC of a commitment made by Arizona Public Service Company (APS) regarding performance criteria for structures.
APS will establish specific structural performance
- criteria, including any necessary procedure revisions to clarify when structures should be moved to Category (a)(1) by October 17, 1996.
Upon completion of this activity, closure documentation willbe provided to the NRC's Resident Inspectors.
Should you have any questions, please contact Scott A. Bauer, Section
- Leader, Licensing at (602) 393-5978.
Sincerely, I
JML/AKK/DRL/pv cc:
L. J. Callan K. E. Perkins K. E. Brockman K. E. Johnston J. W. Clifford 9609270105 9609is PDR ADOCK 05000528 9