ML17312A953

From kanterella
Jump to navigation Jump to search
Advises That Util 960531 Rept WCAP-14617, View Graph Presentation Matl Nrc/Industry Meeting of 960223 on Dented Tube Plate Support Plate Indications & Structural Integrity Will Be Withheld Per 10CFR2.790
ML17312A953
Person / Time
Site: Palo Verde  
Issue date: 09/12/1996
From: Steven Bloom
NRC (Affiliation Not Assigned)
To: Liparulo N
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
References
NUDOCS 9609170056
Download: ML17312A953 (8)


Text

gP,W AEGIJ

'o co I

0O sn

/r, ds

+r

~O

+sI *++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 12, 1996

<o

-5Z.S'r.

N. J. Liparulo, Manager Regulatory 8 Engineering Networks Westinghouse Electric Corporation Nuclear Technology Division P.O.

Box 355 Pittsburg, Pennsylvania 15230-0355

SUBJECT:

REQUEST FOR WITKKOLDING INFORMATION FROM PUBLIC DISCLOSURE (CAW-96-970)

Dear Mr. Liparulo:

By letter d'ated May 31, 1996, Pacific Gas and Electric Company submitted WCAP-14617, "View Graph Presentation Material NRC/Industry Meeting of February 23, 1996 on Dented Tube Support Plate Indications and Structural Integrity," and requested that it be withheld fr'om public disclosure pursuant to 10 CFR 2.790.

A nonproprietary version (WCAP-14618) was also submitted for placement in the Public Document Room.

An affidavit dated May 28,

1996, from Westinghouse Electric Corporation, the owner of the information, was included in the application.

Westinghouse Electric Corporation states that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

"(a)

The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.)

where prevention of its use by any of Westinghous'e's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.

(c)

Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a

similar product.

(d) It reveals aspects of past,

present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse."

We have reviewed your submittal and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of Westinghouse Electric p

Corporation statements, have determined that the submitted information sought p

to be withheld contains trade secrets or proprietary commercial information.

9609i7005h 960912 PDR ADQCK 05000528

,P PDR ZeC PR.E I"SIT@~

~ t 1 f I

Qt.

Mr. N. J. Liparulo CC:

NRC Resident Inspector Diablo Canyon Nuclear Power Plant c/o U.S. Nuclear Regulatory Commission P. 0.

Box 369 Avila Beach, California 93424 Dr. Richard Ferguson, Energy Chair Sierra Club California 1100 11th Street, Suite 311 Sacramento, California 95814 C

Ms. Nancy Culver San Luis Obispo Mothers for Peace P. 0.

Box 164 Pismo Beach, California 93448 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408 Mr. Truman Burns Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Room 4102 San Francisco, California 94102 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services Post Office Box 942732 Sacramento, California 94232 Diablo Canyon Independent Safety Committee ATTN:

Robert R. Wellington, Esq.

Legal Counsel 857 Cass Street, Suite D

Monterey, California 93940 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower 8 Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Christopher J.

Warner, Esq.

Pacific Gas

& Electric Company Post Office Box 7442 San Francisco, California 94120 Mr. Robert P.

Powers Vice President and Plant Manager Diablo Canyon Nuclear Power Plant P. 0.

Box 56 Avila Beach, California 93424 Mr., Gregory M. Rueger Pacific Gas and Electric Company NPG - Mail Code AlOD P.O.

Box 770000 San Francisco, California 94177

p

Hr. N. J. Liparulo Therefore, we have determined that the document entitled "View Graph Presentation Material NRC/Industry Meeting of February 23, 1996 on Dented Tube Support Plate Indications and Structural Integrity," marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.

If the need

arises, we may send copies of this information to our consultants working in this area.

We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC.

You should also understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.

In all review situations, if the NRC needs additional information from you or makes a determination adverse to the above, you will be notified in advance of any public disclosure.

Sincerely, Original signed by:

Steven D. Bloom, Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation cc:

See next page DISTRIBUTION:

Docket.(50-528,

.50-529, 50-530~)

PUBLIC PDIV-2 Reading JRoe EAdensam WBateman EPeyton SBloom HPSiemien

HWong, WCFO JStrosnider DOCUMENT NAME:

WITH.W OFC NAME DATE PD4-2 E ey n:es S'6 EHCB JStros er 98 OGC HPSiemien 93 96 PD

-2 oom 9

96 OFFICIAL RECORD COPY p> 'll)(gl

.l-4 l

Mr. N. J. Liparulo Therefore, we have determined that the document entitled "View Graph Presentation Material NRC/Industry Meeting of February 23, 1996 on Dented Tube Support Plate Indications and Structural Integrity," marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Mithholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.

If the need

arises, we may send copies of this information to our consultants working in this area.

Me will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC.

You should also understand that the NRC may have cause to review this determination in the future, for'xample, if the scope of a Freedom of Information Act request includes your information.

In all review situations, if the NRC needs additional information from you or makes a determination adverse to the above, you will be notified in advance of any public disclosure.

Sincerely, Original signed by:

Steven D. Bloom, Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation cc:

See next page DISTRIBUTION:

Docket (50-528, 50-529, 50-530)

PUBLIC PDIV-2 Reading JRoe EAdensam WBateman EPeyton SBloom MPSiemien

HWong, MCFO JStrosnider DOCUMENT NAME:

MITH.W OFC PD4-2 EMCB OGC Ill PD

-2 NAME DATE S'6 9/4 96 OFFICIAL RECORD COP7 f fl(Igg E ey n:es JStros er MPSiemien 9 hl 96 oom 9

96

J

~

ir

~W~

e, I